Bankhead Dam is a 53.9 MW hydro power plant in Tuscaloosa County, Alabama, operated by Alabama Power Co, and it generated 150,777 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Alabama, and its capacity factor sits at the 49th percentile of U.S. hydro plants. By 2025 generation it ranks 2,897th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

53.9 MWNameplate capacity
32%Capacity factor, 2025, 49th percentile, on 53 MW net summer
0.1%Of AL generation, 2025
62 yearsAverage generator age, by MW

How hard does the Bankhead Dam plant run compared with other hydro plants?

The Bankhead Dam plant had a capacity factor of 32% in 2025 on 53 MW of net summer capacity, the 49th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 119 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bankhead Dam32%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Bankhead Dam plant generating more or less than last year?

Generation at Bankhead Dam rose 39.8% from 2024 to 2025, from 107,847 MWh to 150,777 MWh.

Net generation by period
PeriodMWh
2024107,847
2025150,777
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,298
November 20251,401
October 20252,571
September 20252,231
August 20254,326
July 20258,878
June 202521,512
May 202522,897
April 202519,253
March 202521,539
February 202525,101
January 202518,770
December 20249,701
November 20243,934
October 2024666
September 202411,178
August 2024491
July 20243,727
June 2024678
May 20243,677
April 202412,514
March 202419,587
February 202423,758
January 202417,936

Source: EIA Form EIA-923, through August 2026.

How much of Alabama's electricity comes from the Bankhead Dam plant?

Bankhead Dam made 0.1% of the 141,699,034 MWh reported by Alabama plants in 2025, from 0.2% of the state's 32,890 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 55th largest of 78 plants in Alabama, the 3,671st largest of 14,327 in the U.S. and the 253rd largest of 1,393 hydro plants. By 2025 generation it is the 54th largest of 74 generating plants in the state.

Bankhead Dam within Alabama, 2025
MeasureThis plantAlabamaShare
Capacity (MW)5432,8900.2%
Generation (MWh)150,777141,699,0340.1%
Hydro capacity (MW)543,3181.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Bankhead Dam plant, and when do they retire?

1 operable generator totals 53.9 MW, with an average age of 62 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s154100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric541963n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Bankhead Dam plant?

EIA lists no joint owners for Bankhead Dam. Alabama Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Alabama Power Co charge homes?

Alabama Power Co, the operator of Bankhead Dam, had an average residential price of 17.91¢ per kWh and an average bill of $202 a month in 2025, 11% above the Alabama average of 16.09¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Alabama
Alabama Power Co17.91¢$20211% higher
Alabama average16.09¢$184
U.S. average17.23¢$1517% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Bankhead Dam plant?

Bankhead Dam is in Northport, Tuscaloosa County, Alabama, at 33.4587° N, 87.3568° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Alabama are similar in size?

Alabama has 23 operable hydro plants with 3,318 MW of capacity, and Bankhead Dam's 53.9 MW is 2% of that.

Hydro plants in Alabama around this size
PlantCountyMW2025 MWh
Weiss DamCherokee88187,596
Jones BluffAutauga82250,790
H Neely Henry DamCalhoun73180,851
Bankhead DamTuscaloosa54150,777
Yates DamElmore51114,160
Holt DamTuscaloosa47156,567
Goat RockLee3988,139