Skip to main content
RateWatt

Hydro power plant, Alabama

H Neely Henry Dam, Alabama

H Neely Henry Dam is a 72.9 MW hydro power plant in Calhoun County, Alabama, operated by Alabama Power Co, and it generated 180,851 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Alabama, and its capacity factor sits at the 40th percentile of U.S. hydro plants. By 2025 generation it ranks 2,638th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

72.9 MWNameplate capacity
29%Capacity factor, 2025, 40th percentile, on 71.1 MW net summer
0.1%Of AL generation, 2025
59 yearsAverage generator age, by MW

How hard does the H Neely Henry Dam plant run compared with other hydro plants?

The H Neely Henry Dam plant had a capacity factor of 29% in 2025 on 71.1 MW of net summer capacity, the 40th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
H Neely Henry Dam29%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the H Neely Henry Dam plant generating more or less than last year?

Generation at H Neely Henry Dam rose 0.5% from 2024 to 2025, from 179,881 MWh to 180,851 MWh.

Net generation by period
PeriodMWh
2024179,881
2025180,851
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20257,662
November 20257,737
October 20256,082
September 20255,575
August 20259,014
July 20257,300
June 202518,426
May 202533,168
April 202522,784
March 202520,654
February 202524,619
January 202517,830
December 202415,852
November 202410,402
October 20249,193
September 20247,885
August 20245,877
July 20246,027
June 20247,601
May 202420,088
April 202413,592
March 202432,108
February 202422,607
January 202428,649

Source: EIA Form EIA-923, through August 2026.

How much of Alabama's electricity comes from the H Neely Henry Dam plant?

H Neely Henry Dam made 0.1% of the 141,699,034 MWh reported by Alabama plants in 2025, from 0.2% of the state's 32,890 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 53rd largest of 78 plants in Alabama, the 3,300th largest of 14,327 in the U.S. and the 210th largest of 1,393 hydro plants. By 2025 generation it is the 50th largest of 74 generating plants in the state.

H Neely Henry Dam within Alabama, 2025
MeasureThis plantAlabamaShare
Capacity (MW)7332,8900.2%
Generation (MWh)180,851141,699,0340.1%
Hydro capacity (MW)733,3182.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the H Neely Henry Dam plant, and when do they retire?

3 operable generators total 72.9 MW, with an average age of 59 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s373100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric241966n/a
2OperatingConventional Hydroelectric241966n/a
3OperatingConventional Hydroelectric241966n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the H Neely Henry Dam plant?

EIA lists no joint owners for H Neely Henry Dam. Alabama Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Alabama Power Co charge homes?

Alabama Power Co, the operator of H Neely Henry Dam, had an average residential price of 17.91¢ per kWh and an average bill of $202 a month in 2025, 11% above the Alabama average of 16.09¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Alabama
Alabama Power Co17.91¢$20211% higher
Alabama average16.09¢$184
U.S. average17.23¢$1517% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the H Neely Henry Dam plant?

H Neely Henry Dam is in Ohatchee, Calhoun County, Alabama, at 33.7845° N, 86.0524° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Alabama are similar in size?

Alabama has 23 operable hydro plants with 3,318 MW of capacity, and H Neely Henry Dam's 72.9 MW is 2% of that.

Hydro plants in Alabama around this size
PlantCountyMW2025 MWh
Thurlow DamElmore91190,957
Weiss DamCherokee88187,596
Jones BluffAutauga82250,790
H Neely Henry DamCalhoun73180,851
Bankhead DamTuscaloosa54150,777
Yates DamElmore51114,160
Holt DamTuscaloosa47156,567