Geothermal power plant, Nevada
Beowawe geothermal power plant, Nevada
Beowawe is a 35 MW power plant, 29.2 MW of it geothermal, in Lander County, Nevada, operated by Ormat Nevada Inc, and it generated 167,067 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Nevada, and its capacity factor sits at the 90th percentile of U.S. geothermal plants. By 2025 generation it ranks 2,743rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Beowawe plant run compared with other geothermal plants?
The Beowawe plant's geothermal units had a capacity factor of 95% in 2025 on 20 MW of net summer capacity, the 90th percentile of the 49 U.S. geothermal plants with at least 20 MW. The typical geothermal plant reached 66%. That equals about 348 days at full output out of 365.
0%Shaded: the middle half of geothermal plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Beowawe | 95% |
| Geothermal plants, 75th percentile | 81% |
| Geothermal plants, median | 66% |
| Geothermal plants, 25th percentile | 51% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its geothermal generators only. Values above 105% are left out of the comparison.
Is the Beowawe plant generating more or less than last year?
Beowawe generated 167,067 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 107,208 |
| 2025 | 167,067 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 12,395 |
| November 2025 | 14,891 |
| October 2025 | 15,532 |
| September 2025 | 12,784 |
| August 2025 | 12,070 |
| July 2025 | 11,955 |
| June 2025 | 12,370 |
| May 2025 | 14,391 |
| April 2025 | 15,611 |
| March 2025 | 16,347 |
| February 2025 | 14,799 |
| January 2025 | 13,922 |
| December 2024 | 8,546 |
| November 2024 | 13,956 |
| October 2024 | 12,980 |
| September 2024 | 11,670 |
| August 2024 | 11,229 |
| July 2024 | 10,307 |
| June 2024 | 9,856 |
| May 2024 | 3,590 |
| April 2024 | 0 |
| March 2024 | 8,413 |
| February 2024 | 8,042 |
| January 2024 | 8,619 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Beowawe plant, and when do they retire?
3 operable generators total 35 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 2 have already retired, totalling 20.6 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 3 | 35 | 100% | none reported |
Every generator, 5 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| OEC1 | Operating | Geothermal | 15 | 2024 | n/a |
| OEC2 | Operating | Geothermal | 15 | 2024 | n/a |
| BWSOL | Operating | Solar Photovoltaic | 6 | 2025 | n/a |
| GEN1 | Retired | Geothermal | 17 | 1985 | 2024 |
| GEN2 | Retired | Geothermal | 4 | 2011 | 2024 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Beowawe plant?
EIA lists no joint owners for Beowawe. Ormat Nevada Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Beowawe plant use?
Beowawe has capacity on 2 fuels: 83% geothermal and 17% solar. In 2025, geothermal made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Geothermal | 29 | 83.4% | 167,067 |
| Solar | 6 | 16.6% | n/a |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Beowawe plant?
Beowawe is in Beowawe, Lander County, Nevada, at 40.5547° N, 116.6175° W. It sits in the Nevada Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which geothermal plants in Nevada are similar in size?
Nevada has 26 operable geothermal plants with 914 MW of capacity, and Beowawe's 29.2 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Steamboat Hills LP | Washoe | 32 | 233,924 |
| Galena 3 Geothermal Power Plant | Washoe | 32 | 77,854 |
| North Valley | Washoe | 32 | 196,560 |
| Beowawe | Lander | 29 | 167,067 |
| Desert Peak Power Plant | Lyon | 26 | 78,229 |
| Richard Burdette Geothermal | Washoe | 26 | 88,845 |
| Soda Lake 3 | Churchill | 26 | 118,139 |
Source: EIA Forms EIA-860 and EIA-923, 2025.