Geothermal power plant, Nevada
Desert Peak Power Plant, Nevada
Desert Peak Power Plant is a 26 MW geothermal power plant in Lyon County, Nevada, operated by Ormat Nevada Inc, and it generated 78,229 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Nevada, and its capacity factor sits at the 29th percentile of U.S. geothermal plants. By 2025 generation it ranks 3,664th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Desert Peak Power Plant run compared with other geothermal plants?
Desert Peak Power Plant had a capacity factor of 52% in 2025 on 17.3 MW of net summer capacity, the 29th percentile of the 49 U.S. geothermal plants with at least 20 MW. The typical geothermal plant reached 66%. That equals about 188 days at full output out of 365.
0%Shaded: the middle half of geothermal plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Desert Peak Power Plant | 52% |
| Geothermal plants, 75th percentile | 81% |
| Geothermal plants, median | 66% |
| Geothermal plants, 25th percentile | 51% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Desert Peak Power Plant generating more or less than last year?
Generation at Desert Peak Power Plant rose 7.6% from 2024 to 2025, from 72,684 MWh to 78,229 MWh.
| Period | MWh |
|---|---|
| 2024 | 72,684 |
| 2025 | 78,229 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 7,981 |
| November 2025 | 7,051 |
| October 2025 | 6,791 |
| September 2025 | 5,599 |
| August 2025 | 4,807 |
| July 2025 | 5,200 |
| June 2025 | 5,468 |
| May 2025 | 6,638 |
| April 2025 | 7,023 |
| March 2025 | 7,628 |
| February 2025 | 7,259 |
| January 2025 | 6,784 |
| December 2024 | 6,975 |
| November 2024 | 6,337 |
| October 2024 | 5,645 |
| September 2024 | 5,903 |
| August 2024 | 5,732 |
| July 2024 | 5,021 |
| June 2024 | 5,688 |
| May 2024 | 7,216 |
| April 2024 | 7,241 |
| March 2024 | 5,080 |
| February 2024 | 3,848 |
| January 2024 | 7,998 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Desert Peak Power Plant, and when do they retire?
2 operable generators total 26 MW, with an average age of 19 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 11 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 26 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN2 | Operating | Geothermal | 15 | 2006 | n/a |
| OEC2 | Operating | Geothermal | 11 | 2006 | n/a |
| GEN1 | Retired | Geothermal | 11 | 1985 | 2006 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Desert Peak Power Plant?
Orni 3 LLC is the only joint owner reported for Desert Peak Power Plant, with 100.0%. Ormat Nevada Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is Desert Peak Power Plant?
Desert Peak Power Plant is in Fernley, Lyon County, Nevada, at 39.7540° N, 118.9535° W. It sits in the Nevada Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which geothermal plants in Nevada are similar in size?
Nevada has 26 operable geothermal plants with 914 MW of capacity, and Desert Peak Power Plant's 26 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Galena 3 Geothermal Power Plant | Washoe | 32 | 77,854 |
| North Valley | Washoe | 32 | 196,560 |
| Beowawe | Lander | 29 | 167,067 |
| Desert Peak Power Plant | Lyon | 26 | 78,229 |
| Richard Burdette Geothermal | Washoe | 26 | 88,845 |
| Soda Lake 3 | Churchill | 26 | 118,139 |
| Salt Wells | CHURCHILL | 24 | 63,384 |
Source: EIA Forms EIA-860 and EIA-923, 2025.