Solar power plant, Missouri

Blue Bird Solar, LLC power plant, Missouri

Blue Bird Solar, LLC is a 139 MW solar power plant in Warren County, Missouri, operated by Blue Bird Solar, LLC, and it generated 274,332 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Missouri, and its capacity factor sits at the 46th percentile of U.S. solar plants. By 2025 generation it ranks 2,092nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

139 MWNameplate capacity
23%Capacity factor, 2025, 46th percentile, on 139 MW net summer
0.4%Of MO generation, 2025
1 yearAverage generator age, by MW

How hard does the Blue Bird Solar, LLC plant run compared with other solar plants?

The Blue Bird Solar, LLC plant had a capacity factor of 23% in 2025 on 139 MW of net summer capacity, the 46th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blue Bird Solar, LLC23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blue Bird Solar, LLC plant generating more or less than last year?

Blue Bird Solar, LLC generated 274,332 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 25.6% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
2024394
2025274,332
2026 through August243,927
2025, same months194,208
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202634,038
July 202638,577
June 202635,402
May 202634,095
April 202632,055
March 202627,822
February 202622,729
January 202619,209
December 202511,414
November 202516,428
October 202522,699
September 202529,583
August 202537,140
July 202535,621
June 202531,378
May 202532,179
April 202523,006
March 202517,596
February 202515,821
January 20251,467
December 2024394

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the Blue Bird Solar, LLC plant?

Blue Bird Solar, LLC made 0.4% of the 71,443,096 MWh reported by Missouri plants in 2025, from 0.6% of the state's 23,215 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 43rd largest of 137 plants in Missouri, the 2,155th largest of 14,327 in the U.S. and the 335th largest of 7,223 solar plants. By 2025 generation it is the 26th largest of 122 generating plants in the state.

Blue Bird Solar, LLC within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)13923,2150.6%
Generation (MWh)274,33271,443,0960.4%
Solar capacity (MW)1391,4229.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blue Bird Solar, LLC plant, and when do they retire?

1 operable generator totals 139 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1139100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BBSOperatingSolar Photovoltaic1392024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blue Bird Solar, LLC plant?

EIA lists no joint owners for Blue Bird Solar, LLC. Blue Bird Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Blue Bird Solar, LLC plant?

Blue Bird Solar, LLC is in Warrenton, Warren County, Missouri, at 38.8954° N, 91.1366° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Missouri are similar in size?

Missouri has 35 operable solar plants with 1,422 MW of capacity, and Blue Bird Solar, LLC's 139 MW is 10% of that.

Solar plants in Missouri around this size
PlantCountyMW2025 MWh
New Madrid Solar, LLCNew Madrid20053,949
Kelso SolarScott20013,009
Winfield SolarLincoln150183,559
Blue Bird Solar, LLCWarren139274,332