Solar power plant, Missouri
New Madrid Solar, LLC power plant, Missouri
New Madrid Solar, LLC is a 200 MW solar power plant in New Madrid County, Missouri, operated by New Madrid Solar, LLC, and it generated 53,949 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Missouri, and its capacity factor sits at the 4th percentile of U.S. solar plants. By 2025 generation it ranks 4,000th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the New Madrid Solar, LLC plant run compared with other solar plants?
The New Madrid Solar, LLC plant had a capacity factor of 4% in 2025 on 162 MW of net summer capacity, the 4th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 14 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| New Madrid Solar, LLC | 4% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the New Madrid Solar, LLC plant generating more or less than last year?
New Madrid Solar, LLC generated 53,949 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 53,949 |
| 2026 through August | 350,105 |
Monthly generation, Oct 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 52,766 |
| July 2026 | 52,319 |
| June 2026 | 48,814 |
| May 2026 | 44,639 |
| April 2026 | 42,253 |
| March 2026 | 55,333 |
| February 2026 | 26,043 |
| January 2026 | 27,938 |
| December 2025 | 15,705 |
| November 2025 | 17,816 |
| October 2025 | 20,428 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the New Madrid Solar, LLC plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 3603 | Operating | Solar Photovoltaic | 200 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the New Madrid Solar, LLC plant?
EIA lists no joint owners for New Madrid Solar, LLC. New Madrid Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the New Madrid Solar, LLC plant?
New Madrid Solar, LLC is in Marston, New Madrid County, Missouri, at 36.5004° N, 89.6357° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Missouri are similar in size?
Missouri has 35 operable solar plants with 1,422 MW of capacity, and New Madrid Solar, LLC's 200 MW is 14% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Morris Solar | Adair | 250 | 238,307 |
| Huck Finn Renewable Energy Center | Audrain | 200 | 417,148 |
| New Madrid Solar, LLC | New Madrid | 200 | 53,949 |
| Kelso Solar | Scott | 200 | 13,009 |
| Winfield Solar | Lincoln | 150 | 183,559 |
| Blue Bird Solar, LLC | Warren | 139 | 274,332 |
Source: EIA Forms EIA-860 and EIA-923, 2025.