Morris Solar is a 250 MW solar power plant in Adair County, Missouri, operated by AES Clean Energy, and it generated 238,307 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Missouri, and its capacity factor sits at the 8th percentile of U.S. solar plants. By 2025 generation it ranks 2,281st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Morris Solar plant run compared with other solar plants?
The Morris Solar plant had a capacity factor of 11% in 2025 on 250 MW of net summer capacity, the 8th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 40 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Morris Solar | 11% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Morris Solar plant generating more or less than last year?
Morris Solar generated 238,307 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 151.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 238,307 |
| 2026 through August | 321,493 |
| 2025, same months | 128,071 |
Monthly generation, Jun 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 42,143 |
| July 2026 | 55,857 |
| June 2026 | 45,411 |
| May 2026 | 53,326 |
| April 2026 | 41,360 |
| March 2026 | 36,715 |
| February 2026 | 27,424 |
| January 2026 | 19,257 |
| December 2025 | 13,066 |
| November 2025 | 23,064 |
| October 2025 | 31,376 |
| September 2025 | 42,730 |
| August 2025 | 45,834 |
| July 2025 | 50,112 |
| June 2025 | 32,125 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Morris Solar plant, and when do they retire?
1 operable generator totals 250 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 250 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MORRI | Operating | Solar Photovoltaic | 250 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Morris Solar plant?
EIA lists no joint owners for Morris Solar. AES Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Morris Solar plant?
Morris Solar is in Kirksville, Adair County, Missouri, at 40.1514° N, 92.5993° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Missouri are similar in size?
Missouri has 35 operable solar plants with 1,422 MW of capacity, and Morris Solar's 250 MW is 18% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Morris Solar | Adair | 250 | 238,307 |
| Huck Finn Renewable Energy Center | Audrain | 200 | 417,148 |
| New Madrid Solar, LLC | New Madrid | 200 | 53,949 |
| Kelso Solar | Scott | 200 | 13,009 |
Source: EIA Forms EIA-860 and EIA-923, 2025.