Huck Finn Renewable Energy Center is a 200 MW solar power plant in Audrain County, Missouri, operated by Union Electric Co-(MO), and it generated 417,148 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Missouri, and its capacity factor sits at the 56th percentile of U.S. solar plants. By 2025 generation it ranks 1,540th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
24%Capacity factor, 2025, 56th percentile, on 200 MW net summer
0.6%Of MO generation, 2025
1 yearAverage generator age, by MW

How hard does the Huck Finn Renewable Energy Center plant run compared with other solar plants?

The Huck Finn Renewable Energy Center plant had a capacity factor of 24% in 2025 on 200 MW of net summer capacity, the 56th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 87 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Huck Finn Renewable Energy Center24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Huck Finn Renewable Energy Center plant generating more or less than last year?

Huck Finn Renewable Energy Center generated 417,148 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025417,148
2026 through August337,199
2025, same months316,739
Monthly generation, Jan 2025 to Aug 2026
MonthMWh
August 202647,905
July 202657,317
June 202649,371
May 202652,036
April 202643,748
March 202634,606
February 202631,261
January 202620,955
December 202510,746
November 202521,480
October 202527,031
September 202541,152
August 202549,271
July 202551,747
June 202543,543
May 202542,074
April 202536,246
March 202539,073
February 202526,324
January 202528,461

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the Huck Finn Renewable Energy Center plant?

Huck Finn Renewable Energy Center made 0.6% of the 71,443,096 MWh reported by Missouri plants in 2025, from 0.9% of the state's 23,215 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 31st largest of 137 plants in Missouri, the 1,524th largest of 14,327 in the U.S. and the 188th largest of 7,223 solar plants. By 2025 generation it is the 23rd largest of 122 generating plants in the state.

Huck Finn Renewable Energy Center within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)20023,2150.9%
Generation (MWh)417,14871,443,0960.6%
Solar capacity (MW)2001,42214.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Huck Finn Renewable Energy Center plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HFRECOperatingSolar Photovoltaic2002024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Huck Finn Renewable Energy Center plant?

EIA lists no joint owners for Huck Finn Renewable Energy Center. Union Electric Co-(MO) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Union Electric Co charge homes?

Union Electric Co, the operator of Huck Finn Renewable Energy Center, had an average residential price of 13.27¢ per kWh and an average bill of $137 a month in 2025, about the same as the Missouri average of 13.30¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Missouri
Union Electric Co13.27¢$137about the same
Missouri average13.30¢$138
U.S. average17.23¢$15130% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Huck Finn Renewable Energy Center plant?

Huck Finn Renewable Energy Center is in Vandalia, Audrain County, Missouri, at 39.3140° N, 91.5430° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Missouri are similar in size?

Missouri has 35 operable solar plants with 1,422 MW of capacity, and Huck Finn Renewable Energy Center's 200 MW is 14% of that.

Solar plants in Missouri around this size
PlantCountyMW2025 MWh
Morris SolarAdair250238,307
Huck Finn Renewable Energy CenterAudrain200417,148
New Madrid Solar, LLCNew Madrid20053,949
Kelso SolarScott20013,009
Winfield SolarLincoln150183,559