Solar power plant, Missouri
Huck Finn Renewable Energy Center, Missouri
Huck Finn Renewable Energy Center is a 200 MW solar power plant in Audrain County, Missouri, operated by Union Electric Co-(MO), and it generated 417,148 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Missouri, and its capacity factor sits at the 56th percentile of U.S. solar plants. By 2025 generation it ranks 1,540th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Huck Finn Renewable Energy Center plant run compared with other solar plants?
The Huck Finn Renewable Energy Center plant had a capacity factor of 24% in 2025 on 200 MW of net summer capacity, the 56th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 87 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Huck Finn Renewable Energy Center | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Huck Finn Renewable Energy Center plant generating more or less than last year?
Huck Finn Renewable Energy Center generated 417,148 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 417,148 |
| 2026 through August | 337,199 |
| 2025, same months | 316,739 |
Monthly generation, Jan 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 47,905 |
| July 2026 | 57,317 |
| June 2026 | 49,371 |
| May 2026 | 52,036 |
| April 2026 | 43,748 |
| March 2026 | 34,606 |
| February 2026 | 31,261 |
| January 2026 | 20,955 |
| December 2025 | 10,746 |
| November 2025 | 21,480 |
| October 2025 | 27,031 |
| September 2025 | 41,152 |
| August 2025 | 49,271 |
| July 2025 | 51,747 |
| June 2025 | 43,543 |
| May 2025 | 42,074 |
| April 2025 | 36,246 |
| March 2025 | 39,073 |
| February 2025 | 26,324 |
| January 2025 | 28,461 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Huck Finn Renewable Energy Center plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HFREC | Operating | Solar Photovoltaic | 200 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Huck Finn Renewable Energy Center plant?
EIA lists no joint owners for Huck Finn Renewable Energy Center. Union Electric Co-(MO) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Union Electric Co charge homes?
Union Electric Co, the operator of Huck Finn Renewable Energy Center, had an average residential price of 13.27¢ per kWh and an average bill of $137 a month in 2025, about the same as the Missouri average of 13.30¢.
| Measure | Price | Monthly bill | Against Missouri |
|---|---|---|---|
| Union Electric Co | 13.27¢ | $137 | about the same |
| Missouri average | 13.30¢ | $138 | |
| U.S. average | 17.23¢ | $151 | 30% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Huck Finn Renewable Energy Center plant?
Huck Finn Renewable Energy Center is in Vandalia, Audrain County, Missouri, at 39.3140° N, 91.5430° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Missouri are similar in size?
Missouri has 35 operable solar plants with 1,422 MW of capacity, and Huck Finn Renewable Energy Center's 200 MW is 14% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Morris Solar | Adair | 250 | 238,307 |
| Huck Finn Renewable Energy Center | Audrain | 200 | 417,148 |
| New Madrid Solar, LLC | New Madrid | 200 | 53,949 |
| Kelso Solar | Scott | 200 | 13,009 |
| Winfield Solar | Lincoln | 150 | 183,559 |