Skip to main content
RateWatt

Solar power plant, Missouri

Kelso Solar power plant, Missouri

Kelso Solar is a 200 MW solar power plant in Scott County, Missouri, operated by Kelso Solar, LLC, and it generated 13,009 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 1st percentile of U.S. solar plants. By 2025 generation it ranks 5,736th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
under 1%Capacity factor, 2025, 1st percentile, on 200 MW net summer
5,736thU.S. rank by generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Kelso Solar plant run compared with other solar plants?

The Kelso Solar plant had a capacity factor of under 1% in 2025 on 200 MW of net summer capacity, the 1st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Kelso Solarunder 1%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Kelso Solar plant generating more or less than last year?

Kelso Solar generated 13,009 MWh in 2025; EIA reports no 2024 total to compare.

Net generation by period
PeriodMWh
2024n/a
202513,009
2026 through August251,707
Monthly generation, Dec 2025 to Aug 2026
MonthMWh
August 202644,210
July 202629,293
June 202638,033
May 202635,941
April 202631,709
March 202633,406
February 202624,825
January 202614,290
December 202513,009

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the Kelso Solar plant?

Kelso Solar made 0.0% of the 71,443,096 MWh reported by Missouri plants in 2025, from 0.9% of the state's 23,215 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 31st largest of 137 plants in Missouri, the 1,524th largest of 14,327 in the U.S. and the 192nd largest of 7,223 solar plants. By 2025 generation it is the 66th largest of 122 generating plants in the state.

Kelso Solar within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)20023,2150.9%
Generation (MWh)13,00971,443,0960.0%
Solar capacity (MW)2001,42214.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Kelso Solar plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
KLSO1OperatingSolar Photovoltaic2002025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Kelso Solar plant?

EIA lists no joint owners for Kelso Solar. Kelso Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Kelso Solar plant?

Kelso Solar is in Benton, Scott County, Missouri, at 37.0500° N, 89.5200° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Missouri are similar in size?

Missouri has 35 operable solar plants with 1,422 MW of capacity, and Kelso Solar's 200 MW is 14% of that.

Solar plants in Missouri around this size
PlantCountyMW2025 MWh
Morris SolarAdair250238,307
Huck Finn Renewable Energy CenterAudrain200417,148
New Madrid Solar, LLCNew Madrid20053,949
Kelso SolarScott20013,009
Winfield SolarLincoln150183,559
Blue Bird Solar, LLCWarren139274,332

Source: EIA Forms EIA-860 and EIA-923, 2025.