Wind power plant, Wisconsin

Blue Sky Green Field Wind Project, Wisconsin

Blue Sky Green Field Wind Project is a 145 MW wind power plant in Fond Du Lac County, Wisconsin, operated by Wisconsin Electric Power Co, and it generated 335,439 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Wisconsin, and its capacity factor sits at the 26th percentile of U.S. wind plants. By 2025 generation it ranks 1,829th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

145 MWNameplate capacity
26%Capacity factor, 2025, 26th percentile, on 145 MW net summer
0.5%Of WI generation, 2025
17 yearsAverage generator age, by MW

How hard does the Blue Sky Green Field Wind Project plant run compared with other wind plants?

The Blue Sky Green Field Wind Project plant had a capacity factor of 26% in 2025 on 145 MW of net summer capacity, the 26th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blue Sky Green Field Wind Project26%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blue Sky Green Field Wind Project plant generating more or less than last year?

Generation at Blue Sky Green Field Wind Project rose 1.7% from 2024 to 2025, from 329,955 MWh to 335,439 MWh. Through August 2026 it is running 8.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024329,955
2025335,439
2026 through August200,495
2025, same months220,188
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202610,165
July 202611,917
June 202618,490
May 202627,183
April 202632,532
March 202635,117
February 202628,878
January 202636,213
December 202539,419
November 202535,757
October 202526,779
September 202513,296
August 202511,462
July 202511,851
June 202521,233
May 202520,465
April 202537,351
March 202541,651
February 202529,493
January 202546,682
December 202433,037
November 202438,574
October 202435,681
September 202413,569
August 202412,096
July 20248,109
June 202425,675
May 202423,751
April 202443,507
March 202439,639
February 202429,104
January 202427,213

Source: EIA Form EIA-923, through August 2026.

How much of Wisconsin's electricity comes from the Blue Sky Green Field Wind Project plant?

Blue Sky Green Field Wind Project made 0.5% of the 66,249,756 MWh reported by Wisconsin plants in 2025, from 0.7% of the state's 19,442 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 34th largest of 273 plants in Wisconsin, the 2,105th largest of 14,327 in the U.S. and the 503rd largest of 1,358 wind plants. By 2025 generation it is the 20th largest of 259 generating plants in the state.

Blue Sky Green Field Wind Project within Wisconsin, 2025
MeasureThis plantWisconsinShare
Capacity (MW)14519,4420.7%
Generation (MWh)335,43966,249,7560.5%
Wind capacity (MW)14582317.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blue Sky Green Field Wind Project plant, and when do they retire?

1 operable generator totals 145 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1145100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1452008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blue Sky Green Field Wind Project plant?

EIA lists no joint owners for Blue Sky Green Field Wind Project. Wisconsin Electric Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Wisconsin Electric Power Co charge homes?

Wisconsin Electric Power Co, the operator of Blue Sky Green Field Wind Project, had an average residential price of 20.53¢ per kWh and an average bill of $131 a month in 2025, 14% above the Wisconsin average of 18.08¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Wisconsin
Wisconsin Electric Power Co20.53¢$13114% higher
Wisconsin average18.08¢$121
U.S. average17.23¢$1515% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Blue Sky Green Field Wind Project plant?

Blue Sky Green Field Wind Project is in Fond du Lac, Fond Du Lac County, Wisconsin, at 43.8794° N, 88.2708° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Wisconsin are similar in size?

Wisconsin has 12 operable wind plants with 823 MW of capacity, and Blue Sky Green Field Wind Project's 145 MW is 18% of that.

Wind plants in Wisconsin around this size
PlantCountyMW2025 MWh
Glacier HillsColumbia162368,625
Blue Sky Green Field Wind ProjectFond Du Lac145335,439
Forward Wind Energy CenterDodge129134,640
Quilt Block Wind Farm LLCLafayette98381,137
Red Barn EnergyGrant92253,697

Source: EIA Forms EIA-860 and EIA-923, 2025.