Blue Summit II Wind power plant, Texas

Blue Summit II Wind is a 99.4 MW wind power plant in Wilbarger County, Texas, operated by Blue Summit II Wind, LLC, and it generated 346,902 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 72nd percentile of U.S. wind plants. By 2025 generation it ranks 1,781st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

99.4 MWNameplate capacity
40%Capacity factor, 2025, 72nd percentile, on 99.4 MW net summer
0.1%Of TX generation, 2025
6 yearsAverage generator age, by MW

How hard does the Blue Summit II Wind plant run compared with other wind plants?

The Blue Summit II Wind plant had a capacity factor of 40% in 2025 on 99.4 MW of net summer capacity, the 72nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 145 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blue Summit II Wind40%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blue Summit II Wind plant generating more or less than last year?

Generation at Blue Summit II Wind fell 7.2% from 2024 to 2025, from 373,636 MWh to 346,902 MWh. Through August 2026 it is running 13.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024373,636
2025346,902
2026 through August271,099
2025, same months238,134
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202632,709
July 202628,035
June 202636,151
May 202630,704
April 202638,783
March 202641,721
February 202629,134
January 202633,862
December 202538,485
November 202521,998
October 202527,400
September 202520,885
August 202520,848
July 202523,650
June 202530,442
May 202526,261
April 202538,549
March 202541,675
February 202527,644
January 202529,065
December 202427,316
November 202432,596
October 202432,549
September 202418,852
August 202426,758
July 202428,539
June 202431,818
May 202432,784
April 202440,589
March 202437,730
February 202437,238
January 202426,867

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Blue Summit II Wind plant?

Blue Summit II Wind made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 533rd largest of 1,023 plants in Texas, the 2,730th largest of 14,327 in the U.S. and the 685th largest of 1,358 wind plants. By 2025 generation it is the 364th largest of 816 generating plants in the state.

Blue Summit II Wind within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)99195,9660.1%
Generation (MWh)346,902592,896,1760.1%
Wind capacity (MW)9943,9420.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blue Summit II Wind plant, and when do they retire?

1 operable generator totals 99.4 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s199100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BSIIOperatingOnshore Wind Turbine992019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blue Summit II Wind plant?

EIA lists no joint owners for Blue Summit II Wind. Blue Summit II Wind, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Blue Summit II Wind plant?

Blue Summit II Wind is in Vernon, Wilbarger County, Texas, at 34.2259° N, 99.4780° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Blue Summit II Wind's 99.4 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
South Trent Wind FarmNolan101272,339
Buckthorn WindErath101359,571
Anacacho Wind Farm, LLCKinney100324,269
Blue Summit II WindWilbarger99346,902
Sweetwater Wind 2 LLCNolan99351,691
San Roman Wind I, LLCCameron95255,728
WhitetailWebb92171,418