Wind power plant, Texas
Sweetwater Wind 2 LLC power plant, Texas
Sweetwater Wind 2 LLC is a 98.8 MW wind power plant in Nolan County, Texas, operated by Leeward Asset Management, LLC, and it generated 351,691 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 75th percentile of U.S. wind plants. By 2025 generation it ranks 1,767th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sweetwater Wind 2 LLC plant run compared with other wind plants?
The Sweetwater Wind 2 LLC plant had a capacity factor of 41% in 2025 on 98.8 MW of net summer capacity, the 75th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 148 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sweetwater Wind 2 LLC | 41% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sweetwater Wind 2 LLC plant generating more or less than last year?
Generation at Sweetwater Wind 2 LLC rose 3.3% from 2024 to 2025, from 340,592 MWh to 351,691 MWh.
| Period | MWh |
|---|---|
| 2024 | 340,592 |
| 2025 | 351,691 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 34,469 |
| November 2025 | 29,164 |
| October 2025 | 29,321 |
| September 2025 | 19,404 |
| August 2025 | 20,066 |
| July 2025 | 26,650 |
| June 2025 | 34,692 |
| May 2025 | 26,666 |
| April 2025 | 38,135 |
| March 2025 | 38,156 |
| February 2025 | 26,630 |
| January 2025 | 28,338 |
| December 2024 | 29,343 |
| November 2024 | 33,731 |
| October 2024 | 31,349 |
| September 2024 | 16,253 |
| August 2024 | 22,123 |
| July 2024 | 23,874 |
| June 2024 | 31,950 |
| May 2024 | 23,933 |
| April 2024 | 36,849 |
| March 2024 | 30,068 |
| February 2024 | 34,028 |
| January 2024 | 27,091 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sweetwater Wind 2 LLC plant, and when do they retire?
1 operable generator totals 98.8 MW, with an average age of 20 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 99 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SW2 | Operating | Onshore Wind Turbine | 99 | 2005 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sweetwater Wind 2 LLC plant?
EIA lists no joint owners for Sweetwater Wind 2 LLC. Leeward Asset Management, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sweetwater Wind 2 LLC plant?
Sweetwater Wind 2 LLC is in Sweetwater, Nolan County, Texas, at 32.3472° N, 100.3703° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Sweetwater Wind 2 LLC's 98.8 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Buckthorn Wind | Erath | 101 | 359,571 |
| Anacacho Wind Farm, LLC | Kinney | 100 | 324,269 |
| Blue Summit II Wind | Wilbarger | 99 | 346,902 |
| Sweetwater Wind 2 LLC | Nolan | 99 | 351,691 |
| San Roman Wind I, LLC | Cameron | 95 | 255,728 |
| Whitetail | Webb | 92 | 171,418 |
| Sand Bluff Wind Farm | Glasscock | 90 | 319,676 |
Source: EIA Forms EIA-860 and EIA-923, 2025.