Wind power plant, Texas
Whitetail wind power plant, Texas
Whitetail is a 92 MW wind power plant in Webb County, Texas, operated by Whitetail Wind Energy, LLC, and it generated 171,418 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 13th percentile of U.S. wind plants. By 2025 generation it ranks 2,707th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Whitetail plant run compared with other wind plants?
The Whitetail plant had a capacity factor of 21% in 2025 on 92.3 MW of net summer capacity, the 13th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 77 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Whitetail | 21% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Whitetail plant generating more or less than last year?
Generation at Whitetail rose 0.6% from 2024 to 2025, from 170,370 MWh to 171,418 MWh.
| Period | MWh |
|---|---|
| 2024 | 170,370 |
| 2025 | 171,418 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 10,012 |
| November 2025 | 15,041 |
| October 2025 | 14,022 |
| September 2025 | 11,271 |
| August 2025 | 12,782 |
| July 2025 | 21,251 |
| June 2025 | 22,369 |
| May 2025 | 14,695 |
| April 2025 | 12,748 |
| March 2025 | 15,705 |
| February 2025 | 10,258 |
| January 2025 | 11,264 |
| December 2024 | 15,046 |
| November 2024 | 19,567 |
| October 2024 | 13,828 |
| September 2024 | 10,367 |
| August 2024 | 15,531 |
| July 2024 | 15,646 |
| June 2024 | 20,022 |
| May 2024 | 22,924 |
| April 2024 | 13,704 |
| March 2024 | 9,977 |
| February 2024 | 6,052 |
| January 2024 | 7,706 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Whitetail plant, and when do they retire?
1 operable generator totals 92 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 92 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 92 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Whitetail plant?
EIA lists no joint owners for Whitetail. Whitetail Wind Energy, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Whitetail plant?
Whitetail is in Oilton, Webb County, Texas, at 27.4881° N, 99.0053° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Whitetail's 92 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Blue Summit II Wind | Wilbarger | 99 | 346,902 |
| Sweetwater Wind 2 LLC | Nolan | 99 | 351,691 |
| San Roman Wind I, LLC | Cameron | 95 | 255,728 |
| Whitetail | Webb | 92 | 171,418 |
| Sand Bluff Wind Farm | Glasscock | 90 | 319,676 |
| Post Wind Farm LP | Borden | 84 | 311,814 |
| NWP Indian Mesa Wind Farm | Pecos | 83 | 178,492 |
Source: EIA Forms EIA-860 and EIA-923, 2025.