Wind power plant, Texas
Sand Bluff Wind Farm, Texas
Sand Bluff Wind Farm is a 89.5 MW wind power plant in Glasscock County, Texas, operated by RWE Clean Energy, and it generated 319,676 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 76th percentile of U.S. wind plants. By 2025 generation it ranks 1,887th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sand Bluff Wind Farm plant run compared with other wind plants?
The Sand Bluff Wind Farm plant had a capacity factor of 41% in 2025 on 89.5 MW of net summer capacity, the 76th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 149 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sand Bluff Wind Farm | 41% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sand Bluff Wind Farm plant generating more or less than last year?
Generation at Sand Bluff Wind Farm rose 0.5% from 2024 to 2025, from 318,241 MWh to 319,676 MWh.
| Period | MWh |
|---|---|
| 2024 | 318,241 |
| 2025 | 319,676 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 31,925 |
| November 2025 | 27,942 |
| October 2025 | 27,165 |
| September 2025 | 21,394 |
| August 2025 | 19,676 |
| July 2025 | 19,984 |
| June 2025 | 23,513 |
| May 2025 | 26,771 |
| April 2025 | 34,873 |
| March 2025 | 33,903 |
| February 2025 | 25,557 |
| January 2025 | 26,973 |
| December 2024 | 22,014 |
| November 2024 | 26,085 |
| October 2024 | 29,063 |
| September 2024 | 16,885 |
| August 2024 | 23,768 |
| July 2024 | 22,683 |
| June 2024 | 29,954 |
| May 2024 | 27,446 |
| April 2024 | 32,783 |
| March 2024 | 30,189 |
| February 2024 | 33,074 |
| January 2024 | 24,297 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sand Bluff Wind Farm plant, and when do they retire?
1 operable generator totals 89.5 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 90 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 2 | Operating | Onshore Wind Turbine | 90 | 2007 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sand Bluff Wind Farm plant?
EIA lists no joint owners for Sand Bluff Wind Farm. RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sand Bluff Wind Farm plant?
Sand Bluff Wind Farm is in Big Spring, Glasscock County, Texas, at 31.9914° N, 101.3026° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Sand Bluff Wind Farm's 89.5 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sweetwater Wind 2 LLC | Nolan | 99 | 351,691 |
| San Roman Wind I, LLC | Cameron | 95 | 255,728 |
| Whitetail | Webb | 92 | 171,418 |
| Sand Bluff Wind Farm | Glasscock | 90 | 319,676 |
| Post Wind Farm LP | Borden | 84 | 311,814 |
| NWP Indian Mesa Wind Farm | Pecos | 83 | 178,492 |
| Woodward Mountain I | Pecos | 82 | 147,603 |
Source: EIA Forms EIA-860 and EIA-923, 2025.