Wind power plant, Texas
Woodward Mountain I wind power plant, Texas
Woodward Mountain I is a 82 MW wind power plant in Pecos County, Texas, operated by Pecos Wind I LP, and it generated 147,603 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 12th percentile of U.S. wind plants. By 2025 generation it ranks 2,924th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Woodward Mountain I plant run compared with other wind plants?
The Woodward Mountain I plant had a capacity factor of 21% in 2025 on 82 MW of net summer capacity, the 12th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 75 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Woodward Mountain I | 21% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Woodward Mountain I plant generating more or less than last year?
Generation at Woodward Mountain I fell 12.1% from 2024 to 2025, from 168,014 MWh to 147,603 MWh.
| Period | MWh |
|---|---|
| 2024 | 168,014 |
| 2025 | 147,603 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 9,057 |
| November 2025 | 11,309 |
| October 2025 | 14,861 |
| September 2025 | 11,326 |
| August 2025 | 10,044 |
| July 2025 | 11,851 |
| June 2025 | 16,433 |
| May 2025 | 17,141 |
| April 2025 | 13,416 |
| March 2025 | 13,960 |
| February 2025 | 8,361 |
| January 2025 | 9,844 |
| December 2024 | 11,591 |
| November 2024 | 13,247 |
| October 2024 | 15,701 |
| September 2024 | 10,202 |
| August 2024 | 14,579 |
| July 2024 | 13,742 |
| June 2024 | 17,833 |
| May 2024 | 18,465 |
| April 2024 | 13,961 |
| March 2024 | 11,116 |
| February 2024 | 13,986 |
| January 2024 | 13,591 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Woodward Mountain I plant, and when do they retire?
1 operable generator totals 82 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 82 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 01 | Operating | Onshore Wind Turbine | 82 | 2001 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Woodward Mountain I plant?
RISEC Operating Services is the only joint owner reported for Woodward Mountain I, with 100.0%. Pecos Wind I LP operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Woodward Mountain I plant?
Woodward Mountain I is in Girvin, Pecos County, Texas, at 30.9514° N, 102.4141° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Woodward Mountain I's 82 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sand Bluff Wind Farm | Glasscock | 90 | 319,676 |
| Post Wind Farm LP | Borden | 84 | 311,814 |
| NWP Indian Mesa Wind Farm | Pecos | 83 | 178,492 |
| Woodward Mountain I | Pecos | 82 | 147,603 |
| Sweetwater Wind 5 | Nolan | 81 | 172,495 |
| Llano Estacado Wind Ranch | Carson | 80 | 76,996 |
| Lorenzo Wind | Crosby | 80 | 337,663 |
Source: EIA Forms EIA-860 and EIA-923, 2025.