Wind power plant, Texas
Lorenzo Wind power plant, Texas
Lorenzo Wind is a 80 MW wind power plant in Crosby County, Texas, operated by Lorenzo Wind, LLC, and it generated 337,663 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 97th percentile of U.S. wind plants. By 2025 generation it ranks 1,820th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lorenzo Wind plant run compared with other wind plants?
The Lorenzo Wind plant had a capacity factor of 48% in 2025 on 80 MW of net summer capacity, the 97th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 176 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lorenzo Wind | 48% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Lorenzo Wind plant generating more or less than last year?
Generation at Lorenzo Wind fell 4.7% from 2024 to 2025, from 354,238 MWh to 337,663 MWh. Through August 2026 it is running 9.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 354,238 |
| 2025 | 337,663 |
| 2026 through August | 244,573 |
| 2025, same months | 224,139 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 25,931 |
| July 2026 | 22,459 |
| June 2026 | 32,417 |
| May 2026 | 31,157 |
| April 2026 | 33,682 |
| March 2026 | 35,054 |
| February 2026 | 30,118 |
| January 2026 | 33,755 |
| December 2025 | 35,743 |
| November 2025 | 30,106 |
| October 2025 | 27,955 |
| September 2025 | 19,720 |
| August 2025 | 23,398 |
| July 2025 | 20,604 |
| June 2025 | 29,784 |
| May 2025 | 29,584 |
| April 2025 | 36,532 |
| March 2025 | 36,363 |
| February 2025 | 22,533 |
| January 2025 | 25,341 |
| December 2024 | 27,891 |
| November 2024 | 30,596 |
| October 2024 | 31,708 |
| September 2024 | 19,754 |
| August 2024 | 23,319 |
| July 2024 | 22,497 |
| June 2024 | 30,499 |
| May 2024 | 34,050 |
| April 2024 | 37,057 |
| March 2024 | 33,454 |
| February 2024 | 36,495 |
| January 2024 | 26,918 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lorenzo Wind plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FIBE1 | Operating | Onshore Wind Turbine | 80 | 2018 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lorenzo Wind plant?
EIA lists no joint owners for Lorenzo Wind. Lorenzo Wind, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Lorenzo Wind plant?
Lorenzo Wind is in Lorenzo, Crosby County, Texas, at 33.6992° N, 101.5247° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Lorenzo Wind's 80 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Woodward Mountain I | Pecos | 82 | 147,603 |
| Sweetwater Wind 5 | Nolan | 81 | 172,495 |
| Llano Estacado Wind Ranch | Carson | 80 | 76,996 |
| Lorenzo Wind | Crosby | 80 | 337,663 |
| Porterhouse Wind (4) LLC | Hansford | 80 | 66,198 |
| Majestic II Wind | Carson | 80 | 179,647 |
| Majestic 1 Wind Farm | Carson | 80 | 349,675 |
Source: EIA Forms EIA-860 and EIA-923, 2025.