Wind power plant, Texas

Sweetwater Wind 5 power plant, Texas

Sweetwater Wind 5 is a 80.5 MW wind power plant in Nolan County, Texas, operated by Leeward Asset Management, LLC, and it generated 172,495 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 20th percentile of U.S. wind plants. By 2025 generation it ranks 2,701st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80.5 MWNameplate capacity
24%Capacity factor, 2025, 20th percentile, on 80.5 MW net summer
2,701stU.S. rank by generation, 2025
18 yearsAverage generator age, by MW

How hard does the Sweetwater Wind 5 plant run compared with other wind plants?

The Sweetwater Wind 5 plant had a capacity factor of 24% in 2025 on 80.5 MW of net summer capacity, the 20th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sweetwater Wind 524%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sweetwater Wind 5 plant generating more or less than last year?

Generation at Sweetwater Wind 5 rose 5.7% from 2024 to 2025, from 163,229 MWh to 172,495 MWh.

Net generation by period
PeriodMWh
2024163,229
2025172,495
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202515,721
November 202513,718
October 202513,930
September 20258,381
August 20259,912
July 202512,067
June 202518,529
May 202516,400
April 202520,220
March 202515,740
February 202513,491
January 202514,386
December 202414,049
November 202417,080
October 202410,219
September 20248,135
August 202410,950
July 202411,722
June 202415,797
May 202416,390
April 202416,547
March 202412,645
February 202417,157
January 202412,538

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Sweetwater Wind 5 plant?

Sweetwater Wind 5 made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.0% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 550th largest of 1,023 plants in Texas, the 2,960th largest of 14,327 in the U.S. and the 744th largest of 1,358 wind plants. By 2025 generation it is the 459th largest of 816 generating plants in the state.

Sweetwater Wind 5 within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)81195,9660.0%
Generation (MWh)172,495592,896,1760.0%
Wind capacity (MW)8143,9420.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sweetwater Wind 5 plant, and when do they retire?

1 operable generator totals 80.5 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s181100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SW5OperatingOnshore Wind Turbine812007n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sweetwater Wind 5 plant?

EIA lists no joint owners for Sweetwater Wind 5. Leeward Asset Management, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sweetwater Wind 5 plant?

Sweetwater Wind 5 is in Roscoe, Nolan County, Texas, at 32.2369° N, 100.4833° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Sweetwater Wind 5's 80.5 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Post Wind Farm LPBorden84311,814
NWP Indian Mesa Wind FarmPecos83178,492
Woodward Mountain IPecos82147,603
Sweetwater Wind 5Nolan81172,495
Llano Estacado Wind RanchCarson8076,996
Lorenzo WindCrosby80337,663
Porterhouse Wind (4) LLCHansford8066,198

Source: EIA Forms EIA-860 and EIA-923, 2025.