Solar power plant, Virginia

Bluestone Solar power plant, Virginia

Bluestone Solar is a 49.9 MW solar power plant in Mecklenburg County, Virginia, operated by Bluestone Farm Solar, LLC, and it generated 82,073 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 19th percentile of U.S. solar plants. By 2025 generation it ranks 3,618th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

49.9 MWNameplate capacity
19%Capacity factor, 2025, 19th percentile, on 49.9 MW net summer
0.1%Of VA generation, 2025
4 yearsAverage generator age, by MW

How hard does the Bluestone Solar plant run compared with other solar plants?

The Bluestone Solar plant had a capacity factor of 19% in 2025 on 49.9 MW of net summer capacity, the 19th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 69 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bluestone Solar19%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Bluestone Solar plant generating more or less than last year?

Generation at Bluestone Solar rose 24.4% from 2024 to 2025, from 65,964 MWh to 82,073 MWh. Through August 2026 it is running 5.7% behind the same months of 2025.

Net generation by period
PeriodMWh
202465,964
202582,073
2026 through August58,227
2025, same months61,766
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20268,231
July 20268,000
June 202610,162
May 20268,563
April 20267,744
March 20267,809
February 20264,201
January 20263,517
December 20253,060
November 20254,774
October 20256,003
September 20256,470
August 20257,947
July 20259,732
June 20259,816
May 20258,275
April 20258,792
March 20258,085
February 20254,612
January 20254,507
December 20243,670
November 20244,490
October 20246,434
September 20245,253
August 20246,559
July 20246,888
June 20248,938
May 20247,299
April 20243,823
March 20244,822
February 20244,580
January 20243,208

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Bluestone Solar plant?

Bluestone Solar made 0.1% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.2% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 81st largest of 259 plants in Virginia, the 3,835th largest of 14,327 in the U.S. and the 921st largest of 7,223 solar plants. By 2025 generation it is the 77th largest of 241 generating plants in the state.

Bluestone Solar within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)5031,3120.2%
Generation (MWh)82,073106,220,8590.1%
Solar capacity (MW)505,1631.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Bluestone Solar plant, and when do they retire?

1 operable generator totals 49.9 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BLUE1OperatingSolar Photovoltaic502021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Bluestone Solar plant?

EIA lists no joint owners for Bluestone Solar. Bluestone Farm Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Bluestone Solar plant?

Bluestone Solar is in Chase City, Mecklenburg County, Virginia, at 36.8115° N, 78.4839° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Bluestone Solar's 49.9 MW is 1% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Meherrin SolarGreensville60121,988
Sunnybrook Solar Project - HybridHalifax5189,837
Whitehorn SolarPittsylvania5077,599
Bluestone SolarMecklenburg5082,073
Sycamore SolarPittsylvania4285,894
Caden Energix Hickory LLCChesapeake City3257,143
Caden Energix Endless Caverns, LLCRockingham3153,551

Source: EIA Forms EIA-860 and EIA-923, 2025.