Skip to main content
RateWatt

Solar power plant, Virginia

Sunnybrook Solar Project-Hybrid power plant, Virginia

Sunnybrook Solar Project-Hybrid is a 51 MW solar power plant in Halifax County, Virginia, operated by Sunnybrook Farm Solar, LLC, and it generated 89,837 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 26th percentile of U.S. solar plants. By 2025 generation it ranks 3,512th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

51 MWNameplate capacity
20%Capacity factor, 2025, 26th percentile, on 51 MW net summer
0.1%Of VA generation, 2025
3 yearsAverage generator age, by MW

How hard does the Sunnybrook Solar Project-Hybrid plant run compared with other solar plants?

The Sunnybrook Solar Project-Hybrid plant had a capacity factor of 20% in 2025 on 51 MW of net summer capacity, the 26th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 73 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sunnybrook Solar Project-Hybrid20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sunnybrook Solar Project-Hybrid plant generating more or less than last year?

Generation at Sunnybrook Solar Project-Hybrid rose 4.0% from 2024 to 2025, from 86,372 MWh to 89,837 MWh. Through August 2026 it is running 0.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202486,372
202589,837
2026 through August66,560
2025, same months66,456
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,047
July 20268,925
June 202611,204
May 202610,072
April 20269,852
March 20268,391
February 20264,754
January 20264,315
December 20253,700
November 20255,363
October 20257,025
September 20257,293
August 20259,027
July 202510,133
June 202510,129
May 20258,576
April 20259,374
March 20258,776
February 20255,184
January 20255,257
December 20243,717
November 20244,395
October 20247,365
September 20246,357
August 20248,401
July 20249,111
June 202410,782
May 20249,309
April 20249,130
March 20247,872
February 20245,555
January 20244,378

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Sunnybrook Solar Project-Hybrid plant?

Sunnybrook Solar Project-Hybrid made 0.1% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.2% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 79th largest of 259 plants in Virginia, the 3,720th largest of 14,327 in the U.S. and the 857th largest of 7,223 solar plants. By 2025 generation it is the 75th largest of 241 generating plants in the state.

Sunnybrook Solar Project-Hybrid within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)5131,3120.2%
Generation (MWh)89,837106,220,8590.1%
Solar capacity (MW)515,1631.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sunnybrook Solar Project-Hybrid plant, and when do they retire?

1 operable generator totals 51 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s151100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SUNSOperatingSolar Photovoltaic512022n/a
SUNBPostponed indefinitelyBatteries13n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sunnybrook Solar Project-Hybrid plant?

EIA lists no joint owners for Sunnybrook Solar Project-Hybrid. Sunnybrook Farm Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sunnybrook Solar Project-Hybrid plant?

Sunnybrook Solar Project-Hybrid is in Scottsburg, Halifax County, Virginia, at 36.7987° N, 78.8396° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Sunnybrook Solar Project-Hybrid's 51 MW is 1% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Madison Solar (VA)Orange63119,079
Otter Creek SolarMecklenburg60127,646
Meherrin SolarGreensville60121,988
Sunnybrook Solar Project - HybridHalifax5189,837
Whitehorn SolarPittsylvania5077,599
Bluestone SolarMecklenburg5082,073
Sycamore SolarPittsylvania4285,894

Source: EIA Forms EIA-860 and EIA-923, 2025.