Madison Solar (VA) is a 62.5 MW solar power plant in Orange County, Virginia, operated by AES Clean Energy, and it generated 119,079 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 39th percentile of U.S. solar plants. By 2025 generation it ranks 3,211th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Madison Solar (VA) plant run compared with other solar plants?
The Madison Solar (VA) plant had a capacity factor of 22% in 2025 on 62.5 MW of net summer capacity, the 39th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 79 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Madison Solar (VA) | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Madison Solar (VA) plant generating more or less than last year?
Madison Solar (VA) generated 119,079 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 7.1% ahead of the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 21,704 |
| 2025 | 119,079 |
| 2026 through August | 93,667 |
| 2025, same months | 87,452 |
Monthly generation, Sep 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 12,947 |
| July 2026 | 14,534 |
| June 2026 | 15,543 |
| May 2026 | 13,805 |
| April 2026 | 13,472 |
| March 2026 | 10,039 |
| February 2026 | 7,219 |
| January 2026 | 6,108 |
| December 2025 | 4,675 |
| November 2025 | 6,809 |
| October 2025 | 9,812 |
| September 2025 | 10,331 |
| August 2025 | 12,368 |
| July 2025 | 13,890 |
| June 2025 | 14,116 |
| May 2025 | 12,528 |
| April 2025 | 11,756 |
| March 2025 | 10,668 |
| February 2025 | 6,257 |
| January 2025 | 5,869 |
| December 2024 | 4,496 |
| November 2024 | 5,930 |
| October 2024 | 8,998 |
| September 2024 | 2,280 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Madison Solar (VA) plant, and when do they retire?
1 operable generator totals 62.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 63 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MDSO | Operating | Solar Photovoltaic | 63 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Madison Solar (VA) plant?
EIA lists no joint owners for Madison Solar (VA). AES Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Madison Solar (VA) plant?
Madison Solar (VA) is in Locust Grove, Orange County, Virginia, at 38.2878° N, 77.8400° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Virginia are similar in size?
Virginia has 141 operable solar plants with 5,163 MW of capacity, and Madison Solar (VA)'s 62.5 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Bedford Solar (Dominion) | Chesapeake City | 70 | 119,501 |
| Caden Energix Axton LLC | Henry | 66 | 123,086 |
| Crystal Hill Solar | Halifax | 65 | 128,562 |
| Madison Solar (VA) | Orange | 63 | 119,079 |
| Otter Creek Solar | Mecklenburg | 60 | 127,646 |
| Meherrin Solar | Greensville | 60 | 121,988 |
| Sunnybrook Solar Project - Hybrid | Halifax | 51 | 89,837 |
Source: EIA Forms EIA-860 and EIA-923, 2025.