Skip to main content
RateWatt

Solar power plant, Virginia

Madison Solar power plant, Virginia

Madison Solar (VA) is a 62.5 MW solar power plant in Orange County, Virginia, operated by AES Clean Energy, and it generated 119,079 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 39th percentile of U.S. solar plants. By 2025 generation it ranks 3,211th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

62.5 MWNameplate capacity
22%Capacity factor, 2025, 39th percentile, on 62.5 MW net summer
0.1%Of VA generation, 2025
1 yearAverage generator age, by MW

How hard does the Madison Solar (VA) plant run compared with other solar plants?

The Madison Solar (VA) plant had a capacity factor of 22% in 2025 on 62.5 MW of net summer capacity, the 39th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 79 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Madison Solar (VA)22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Madison Solar (VA) plant generating more or less than last year?

Madison Solar (VA) generated 119,079 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 7.1% ahead of the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.

Net generation by period
PeriodMWh
202421,704
2025119,079
2026 through August93,667
2025, same months87,452
Monthly generation, Sep 2024 to Aug 2026
MonthMWh
August 202612,947
July 202614,534
June 202615,543
May 202613,805
April 202613,472
March 202610,039
February 20267,219
January 20266,108
December 20254,675
November 20256,809
October 20259,812
September 202510,331
August 202512,368
July 202513,890
June 202514,116
May 202512,528
April 202511,756
March 202510,668
February 20256,257
January 20255,869
December 20244,496
November 20245,930
October 20248,998
September 20242,280

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Madison Solar (VA) plant?

Madison Solar (VA) made 0.1% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.2% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 74th largest of 259 plants in Virginia, the 3,469th largest of 14,327 in the U.S. and the 797th largest of 7,223 solar plants. By 2025 generation it is the 73rd largest of 241 generating plants in the state.

Madison Solar (VA) within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)6331,3120.2%
Generation (MWh)119,079106,220,8590.1%
Solar capacity (MW)635,1631.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Madison Solar (VA) plant, and when do they retire?

1 operable generator totals 62.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s163100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MDSOOperatingSolar Photovoltaic632024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Madison Solar (VA) plant?

EIA lists no joint owners for Madison Solar (VA). AES Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Madison Solar (VA) plant?

Madison Solar (VA) is in Locust Grove, Orange County, Virginia, at 38.2878° N, 77.8400° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Madison Solar (VA)'s 62.5 MW is 1% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Bedford Solar (Dominion)Chesapeake City70119,501
Caden Energix Axton LLCHenry66123,086
Crystal Hill SolarHalifax65128,562
Madison Solar (VA)Orange63119,079
Otter Creek SolarMecklenburg60127,646
Meherrin SolarGreensville60121,988
Sunnybrook Solar Project - HybridHalifax5189,837

Source: EIA Forms EIA-860 and EIA-923, 2025.