Solar power plant, Virginia

Meherrin Solar power plant, Virginia

Meherrin Solar is a 59.6 MW solar power plant in Greensville County, Virginia, operated by Dominion Renewable Energy, and it generated 121,988 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 52nd percentile of U.S. solar plants. By 2025 generation it ranks 3,180th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

59.6 MWNameplate capacity
23%Capacity factor, 2025, 52nd percentile, on 59.6 MW net summer
0.1%Of VA generation, 2025
3 yearsAverage generator age, by MW

How hard does the Meherrin Solar plant run compared with other solar plants?

The Meherrin Solar plant had a capacity factor of 23% in 2025 on 59.6 MW of net summer capacity, the 52nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Meherrin Solar23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Meherrin Solar plant generating more or less than last year?

Generation at Meherrin Solar rose 4.5% from 2024 to 2025, from 116,690 MWh to 121,988 MWh. Through August 2026 it is running 2.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024116,690
2025121,988
2026 through August91,218
2025, same months88,966
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,241
July 202613,440
June 202612,270
May 202613,214
April 202613,764
March 202612,120
February 20266,774
January 20266,395
December 20255,702
November 20258,147
October 20259,213
September 20259,960
August 202511,913
July 202516,147
June 202515,751
May 202510,239
April 202512,058
March 202510,065
February 20255,557
January 20257,236
December 20246,246
November 20247,283
October 202411,802
September 20244,379
August 202410,754
July 202413,280
June 202415,795
May 202412,137
April 202412,242
March 202411,322
February 20246,674
January 20244,776

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Meherrin Solar plant?

Meherrin Solar made 0.1% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.2% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 76th largest of 259 plants in Virginia, the 3,556th largest of 14,327 in the U.S. and the 821st largest of 7,223 solar plants. By 2025 generation it is the 69th largest of 241 generating plants in the state.

Meherrin Solar within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)6031,3120.2%
Generation (MWh)121,988106,220,8590.1%
Solar capacity (MW)605,1631.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Meherrin Solar plant, and when do they retire?

1 operable generator totals 59.6 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s160100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MEHEROperatingSolar Photovoltaic602022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Meherrin Solar plant?

EIA lists no joint owners for Meherrin Solar. Dominion Renewable Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Meherrin Solar plant?

Meherrin Solar is in Skippers, Greensville County, Virginia, at 36.5900° N, 77.6500° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Meherrin Solar's 59.6 MW is 1% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Crystal Hill SolarHalifax65128,562
Madison Solar (VA)Orange63119,079
Otter Creek SolarMecklenburg60127,646
Meherrin SolarGreensville60121,988
Sunnybrook Solar Project - HybridHalifax5189,837
Whitehorn SolarPittsylvania5077,599
Bluestone SolarMecklenburg5082,073

Source: EIA Forms EIA-860 and EIA-923, 2025.