Wind power plant, Kansas
Buckeye Wind Energy Center, Kansas
Buckeye Wind Energy Center is a 201 MW wind power plant in Ellis County, Kansas, operated by Invenergy Services LLC, and it generated 561,167 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.9% of the generation reported in Kansas, and its capacity factor sits at the 47th percentile of U.S. wind plants. By 2025 generation it ranks 1,209th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Buckeye Wind Energy Center plant run compared with other wind plants?
The Buckeye Wind Energy Center plant had a capacity factor of 32% in 2025 on 201 MW of net summer capacity, the 47th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 117 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Buckeye Wind Energy Center | 32% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Buckeye Wind Energy Center plant generating more or less than last year?
Generation at Buckeye Wind Energy Center fell 21.2% from 2024 to 2025, from 712,233 MWh to 561,167 MWh. Through August 2026 it is running 36.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 712,233 |
| 2025 | 561,167 |
| 2026 through August | 266,295 |
| 2025, same months | 417,205 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 40,527 |
| July 2026 | 42,969 |
| June 2026 | 19,443 |
| May 2026 | 40,034 |
| April 2026 | 24,427 |
| March 2026 | 37,336 |
| February 2026 | 27,034 |
| January 2026 | 34,525 |
| December 2025 | 38,571 |
| November 2025 | 28,104 |
| October 2025 | 31,414 |
| September 2025 | 45,873 |
| August 2025 | 46,568 |
| July 2025 | 49,586 |
| June 2025 | 54,919 |
| May 2025 | 55,279 |
| April 2025 | 62,599 |
| March 2025 | 35,422 |
| February 2025 | 59,424 |
| January 2025 | 53,408 |
| December 2024 | 55,198 |
| November 2024 | 57,508 |
| October 2024 | 62,272 |
| September 2024 | 67,441 |
| August 2024 | 48,441 |
| July 2024 | 49,711 |
| June 2024 | 69,254 |
| May 2024 | 58,919 |
| April 2024 | 66,428 |
| March 2024 | 66,429 |
| February 2024 | 56,064 |
| January 2024 | 54,568 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Buckeye Wind Energy Center plant, and when do they retire?
1 operable generator totals 201 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 201 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 201 | 2015 | n/a |
| 2 | Cancelled | Onshore Wind Turbine | 70 | n/a | n/a |
| 3 | Cancelled | Onshore Wind Turbine | 106 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Buckeye Wind Energy Center plant?
EIA lists no joint owners for Buckeye Wind Energy Center. Invenergy Services LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Buckeye Wind Energy Center plant?
Buckeye Wind Energy Center is in Hays, Ellis County, Kansas, at 39.0039° N, 99.4142° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Kansas are similar in size?
Kansas has 52 operable wind plants with 9,714 MW of capacity, and Buckeye Wind Energy Center's 201 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Cloud County Wind Farm | Cloud | 201 | 316,473 |
| Post Rock Wind Power Project, LLC | Ellsworth | 201 | 399,630 |
| Sunflower Energy Center, LLC | Marion | 201 | 760,225 |
| Buckeye Wind Energy Center | Ellis | 201 | 561,167 |
| Reading Wind Project | Lyon | 200 | 633,109 |
| Caney River Wind Project | Elk | 200 | 564,297 |
| Cimarron Bend Wind Project I, LLC | Clark | 200 | 747,532 |
Source: EIA Forms EIA-860 and EIA-923, 2025.