Cimarron Bend Wind Project I, LLC power plant, Kansas

Cimarron Bend Wind Project I, LLC is a 200 MW wind power plant in Clark County, Kansas, operated by Cimarron Bend Wind Project I, LLC, and it generated 747,532 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.2% of the generation reported in Kansas, and its capacity factor sits at the 84th percentile of U.S. wind plants. By 2025 generation it ranks 942nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
43%Capacity factor, 2025, 84th percentile, on 200 MW net summer
1.2%Of KS generation, 2025
9 yearsAverage generator age, by MW

How hard does the Cimarron Bend Wind Project I, LLC plant run compared with other wind plants?

The Cimarron Bend Wind Project I, LLC plant had a capacity factor of 43% in 2025 on 200 MW of net summer capacity, the 84th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 156 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cimarron Bend Wind Project I, LLC43%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cimarron Bend Wind Project I, LLC plant generating more or less than last year?

Generation at Cimarron Bend Wind Project I, LLC fell 13.1% from 2024 to 2025, from 860,688 MWh to 747,532 MWh. Through August 2026 it is running 2.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024860,688
2025747,532
2026 through August530,071
2025, same months517,776
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202668,166
July 202655,544
June 202670,919
May 202651,152
April 202684,663
March 202675,389
February 202657,946
January 202666,292
December 202556,627
November 202556,504
October 202572,196
September 202544,429
August 202553,496
July 202559,230
June 202557,496
May 202566,833
April 202581,982
March 202580,999
February 202563,456
January 202554,284
December 202462,623
November 202481,205
October 202479,039
September 202467,942
August 202456,540
July 202462,749
June 202476,289
May 202474,727
April 202486,246
March 202486,131
February 202470,189
January 202457,008

Source: EIA Form EIA-923, through August 2026.

How much of Kansas' electricity comes from the Cimarron Bend Wind Project I, LLC plant?

Cimarron Bend Wind Project I, LLC made 1.2% of the 61,984,540 MWh reported by Kansas plants in 2025, from 1.0% of the state's 20,969 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 34th largest of 190 plants in Kansas, the 1,524th largest of 14,327 in the U.S. and the 304th largest of 1,358 wind plants. By 2025 generation it is the 24th largest of 173 generating plants in the state.

Cimarron Bend Wind Project I, LLC within Kansas, 2025
MeasureThis plantKansasShare
Capacity (MW)20020,9691.0%
Generation (MWh)747,53261,984,5401.2%
Wind capacity (MW)2009,7142.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cimarron Bend Wind Project I, LLC plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2002016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cimarron Bend Wind Project I, LLC plant?

EIA lists no joint owners for Cimarron Bend Wind Project I, LLC. Cimarron Bend Wind Project I, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Cimarron Bend Wind Project I, LLC plant?

Cimarron Bend Wind Project I, LLC is in Minneola, Clark County, Kansas, at 37.3550° N, 99.9910° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Kansas are similar in size?

Kansas has 52 operable wind plants with 9,714 MW of capacity, and Cimarron Bend Wind Project I, LLC's 200 MW is 2% of that.

Wind plants in Kansas around this size
PlantCountyMW2025 MWh
Buckeye Wind Energy CenterEllis201561,167
Reading Wind ProjectLyon200633,109
Caney River Wind ProjectElk200564,297
Cimarron Bend Wind Project I, LLCClark200747,532
Cimarron Bend Wind Project II, LLCClark200766,211
Prairie Queen Wind FarmAllen199435,290
Waverly Wind Farm LLCCoffey199701,220

Source: EIA Forms EIA-860 and EIA-923, 2025.