Reading Wind Project is a 200 MW wind power plant in Lyon County, Kansas, operated by Southern Power Co, and it generated 633,109 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Kansas, and its capacity factor sits at the 61st percentile of U.S. wind plants. By 2025 generation it ranks 1,084th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Reading Wind Project plant run compared with other wind plants?
The Reading Wind Project plant had a capacity factor of 36% in 2025 on 200 MW of net summer capacity, the 61st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 132 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Reading Wind Project | 36% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Reading Wind Project plant generating more or less than last year?
Generation at Reading Wind Project fell 6.0% from 2024 to 2025, from 673,716 MWh to 633,109 MWh. Through August 2026 it is running 10.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 673,716 |
| 2025 | 633,109 |
| 2026 through August | 469,271 |
| 2025, same months | 423,197 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 52,320 |
| July 2026 | 37,227 |
| June 2026 | 53,814 |
| May 2026 | 54,448 |
| April 2026 | 71,011 |
| March 2026 | 77,047 |
| February 2026 | 56,099 |
| January 2026 | 67,305 |
| December 2025 | 67,915 |
| November 2025 | 54,004 |
| October 2025 | 58,059 |
| September 2025 | 29,934 |
| August 2025 | 39,248 |
| July 2025 | 45,143 |
| June 2025 | 45,547 |
| May 2025 | 39,846 |
| April 2025 | 69,642 |
| March 2025 | 79,356 |
| February 2025 | 53,229 |
| January 2025 | 51,186 |
| December 2024 | 59,332 |
| November 2024 | 61,624 |
| October 2024 | 70,188 |
| September 2024 | 37,257 |
| August 2024 | 36,723 |
| July 2024 | 48,173 |
| June 2024 | 55,980 |
| May 2024 | 47,926 |
| April 2024 | 75,460 |
| March 2024 | 75,489 |
| February 2024 | 69,617 |
| January 2024 | 35,947 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Reading Wind Project plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| READW | Operating | Onshore Wind Turbine | 200 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Reading Wind Project plant?
Reading Wind Energy, LLC is the only joint owner reported for Reading Wind Project, with 100.0%. Southern Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Reading Wind Project plant?
Reading Wind Project is in Reading, Lyon County, Kansas, at 38.4750° N, 95.9655° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Kansas are similar in size?
Kansas has 52 operable wind plants with 9,714 MW of capacity, and Reading Wind Project's 200 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Post Rock Wind Power Project, LLC | Ellsworth | 201 | 399,630 |
| Sunflower Energy Center, LLC | Marion | 201 | 760,225 |
| Buckeye Wind Energy Center | Ellis | 201 | 561,167 |
| Reading Wind Project | Lyon | 200 | 633,109 |
| Caney River Wind Project | Elk | 200 | 564,297 |
| Cimarron Bend Wind Project I, LLC | Clark | 200 | 747,532 |
| Cimarron Bend Wind Project II, LLC | Clark | 200 | 766,211 |
Source: EIA Forms EIA-860 and EIA-923, 2025.