Bulldog Solar LLC is a 80 MW solar power plant in Warren County, Georgia, operated by Bulldog Solar LLC, and it generated 171,305 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Georgia, and its capacity factor sits at the 60th percentile of U.S. solar plants. By 2025 generation it ranks 2,708th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
24%Capacity factor, 2025, 60th percentile, on 80 MW net summer
0.1%Of GA generation, 2025
2 yearsAverage generator age, by MW

How hard does the Bulldog Solar LLC plant run compared with other solar plants?

The Bulldog Solar LLC plant had a capacity factor of 24% in 2025 on 80 MW of net summer capacity, the 60th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bulldog Solar LLC24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Bulldog Solar LLC plant generating more or less than last year?

Generation at Bulldog Solar LLC rose 8.3% from 2024 to 2025, from 158,242 MWh to 171,305 MWh. Through August 2026 it is running 11.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024158,242
2025171,305
2026 through August107,581
2025, same months121,785
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,261
July 202616,037
June 202616,461
May 202616,475
April 202616,070
March 20268,882
February 202610,465
January 20268,930
December 20258,707
November 202512,104
October 202512,351
September 202516,358
August 202512,972
July 202518,882
June 202517,832
May 202515,366
April 202518,071
March 202516,011
February 202511,572
January 202511,079
December 20248,773
November 20248,655
October 202415,418
September 202412,069
August 202416,809
July 202413,849
June 202415,233
May 202416,552
April 202417,246
March 202412,979
February 202410,325
January 202410,334

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Bulldog Solar LLC plant?

Bulldog Solar LLC made 0.1% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.2% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 67th largest of 263 plants in Georgia, the 2,965th largest of 14,327 in the U.S. and the 558th largest of 7,223 solar plants. By 2025 generation it is the 64th largest of 242 generating plants in the state.

Bulldog Solar LLC within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)8042,7190.2%
Generation (MWh)171,305144,967,3520.1%
Solar capacity (MW)805,4141.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Bulldog Solar LLC plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PGR37OperatingSolar Photovoltaic802023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Bulldog Solar LLC plant?

EIA lists no joint owners for Bulldog Solar LLC. Bulldog Solar LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Bulldog Solar LLC plant?

Bulldog Solar LLC is in Warrenton, Warren County, Georgia, at 33.3710° N, 82.6780° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and Bulldog Solar LLC's 80 MW is 1% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
Lancaster Solar GARandolph80183,115
Blackwater SolarWare80188,661
SR AileyMontgomery80191,007
Bulldog Solar LLCWarren80171,305
CPV Stagecoach SolarMacon80170,060
White Oak Solar, LLCBurke77139,790
SR TerrellTerrell74172,578