SR Terrell solar power plant, Georgia

SR Terrell is a 74 MW solar power plant in Terrell County, Georgia, operated by SR Terrell, LLC, and it generated 172,578 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Georgia, and its capacity factor sits at the 75th percentile of U.S. solar plants. By 2025 generation it ranks 2,700th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74 MWNameplate capacity
27%Capacity factor, 2025, 75th percentile, on 74 MW net summer
0.1%Of GA generation, 2025
5 yearsAverage generator age, by MW

How hard does the SR Terrell plant run compared with other solar plants?

The SR Terrell plant had a capacity factor of 27% in 2025 on 74 MW of net summer capacity, the 75th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
SR Terrell27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the SR Terrell plant generating more or less than last year?

Generation at SR Terrell rose 2.7% from 2024 to 2025, from 168,066 MWh to 172,578 MWh. Through August 2026 it is running 9.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024168,066
2025172,578
2026 through August111,773
2025, same months123,428
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,840
July 202618,471
June 202616,137
May 202611,414
April 202615,149
March 202614,012
February 202611,412
January 20269,338
December 20258,048
November 202512,177
October 202512,578
September 202516,347
August 202514,605
July 202520,179
June 202517,709
May 202516,345
April 202516,839
March 202515,972
February 202510,851
January 202510,928
December 20249,532
November 20248,466
October 202415,526
September 202411,163
August 202420,797
July 202415,646
June 202417,735
May 202417,099
April 202416,122
March 202413,825
February 202411,681
January 202410,474

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the SR Terrell plant?

SR Terrell made 0.1% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.2% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 76th largest of 263 plants in Georgia, the 3,284th largest of 14,327 in the U.S. and the 752nd largest of 7,223 solar plants. By 2025 generation it is the 63rd largest of 242 generating plants in the state.

SR Terrell within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)7442,7190.2%
Generation (MWh)172,578144,967,3520.1%
Solar capacity (MW)745,4141.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the SR Terrell plant, and when do they retire?

1 operable generator totals 74 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s174100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TERRLOperatingSolar Photovoltaic742020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the SR Terrell plant?

EIA lists no joint owners for SR Terrell. SR Terrell, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the SR Terrell plant?

SR Terrell is in Dawson, Terrell County, Georgia, at 31.8714° N, 84.3620° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and SR Terrell's 74 MW is 1% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
Bulldog Solar LLCWarren80171,305
CPV Stagecoach SolarMacon80170,060
White Oak Solar, LLCBurke77139,790
SR TerrellTerrell74172,578
SR Cedar Springs, LLCEarly70164,226
Hobnail SolarBurke70163,394
SR PerryHouston68157,117