Skip to main content
RateWatt

Solar power plant, Georgia

SR Cedar Springs, LLC solar power plant, Georgia

SR Cedar Springs, LLC is a 70 MW solar power plant in Early County, Georgia, operated by SR Cedar Springs, LLC, and it generated 164,226 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Georgia, and its capacity factor sits at the 76th percentile of U.S. solar plants. By 2025 generation it ranks 2,769th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

70 MWNameplate capacity
27%Capacity factor, 2025, 76th percentile, on 70 MW net summer
0.1%Of GA generation, 2025
3 yearsAverage generator age, by MW

How hard does the SR Cedar Springs, LLC plant run compared with other solar plants?

The SR Cedar Springs, LLC plant had a capacity factor of 27% in 2025 on 70 MW of net summer capacity, the 76th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 98 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
SR Cedar Springs, LLC27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the SR Cedar Springs, LLC plant generating more or less than last year?

Generation at SR Cedar Springs, LLC rose 2.4% from 2024 to 2025, from 160,337 MWh to 164,226 MWh. Through August 2026 it is running 3.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024160,337
2025164,226
2026 through August112,988
2025, same months116,566
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,040
July 202616,445
June 202615,256
May 202614,530
April 202616,744
March 202615,212
February 202610,555
January 20269,206
December 20257,950
November 202511,895
October 202512,144
September 202515,671
August 202520,593
July 202516,357
June 202515,360
May 202516,123
April 202515,397
March 202513,430
February 20258,949
January 202510,357
December 20249,340
November 20248,573
October 202414,539
September 202410,789
August 202418,401
July 202416,106
June 202417,848
May 202416,411
April 202413,947
March 202413,232
February 202410,902
January 202410,249

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the SR Cedar Springs, LLC plant?

SR Cedar Springs, LLC made 0.1% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.2% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 263 plants in Georgia, the 3,346th largest of 14,327 in the U.S. and the 771st largest of 7,223 solar plants. By 2025 generation it is the 66th largest of 242 generating plants in the state.

SR Cedar Springs, LLC within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)7042,7190.2%
Generation (MWh)164,226144,967,3520.1%
Solar capacity (MW)705,4141.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the SR Cedar Springs, LLC plant, and when do they retire?

1 operable generator totals 70 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s170100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SRCSOperatingSolar Photovoltaic702022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the SR Cedar Springs, LLC plant?

EIA lists no joint owners for SR Cedar Springs, LLC. SR Cedar Springs, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the SR Cedar Springs, LLC plant?

SR Cedar Springs, LLC is in Blakely, Early County, Georgia, at 31.2453° N, 85.0870° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and SR Cedar Springs, LLC's 70 MW is 1% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
CPV Stagecoach SolarMacon80170,060
White Oak Solar, LLCBurke77139,790
SR TerrellTerrell74172,578
SR Cedar Springs, LLCEarly70164,226
Hobnail SolarBurke70163,394
SR PerryHouston68157,117
SR DeSoto IILee65153,120

Source: EIA Forms EIA-860 and EIA-923, 2025.