Skip to main content
RateWatt

Solar power plant, Georgia

SR DeSoto II solar power plant, Georgia

SR DeSoto II is a 65 MW solar power plant in Lee County, Georgia, operated by SR DeSoto II, LLC, and it generated 153,120 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Georgia, and its capacity factor sits at the 77th percentile of U.S. solar plants. By 2025 generation it ranks 2,868th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

65 MWNameplate capacity
27%Capacity factor, 2025, 77th percentile, on 65 MW net summer
0.1%Of GA generation, 2025
2 yearsAverage generator age, by MW

How hard does the SR DeSoto II plant run compared with other solar plants?

The SR DeSoto II plant had a capacity factor of 27% in 2025 on 65 MW of net summer capacity, the 77th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 98 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
SR DeSoto II27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the SR DeSoto II plant generating more or less than last year?

Generation at SR DeSoto II rose 0.9% from 2024 to 2025, from 151,717 MWh to 153,120 MWh. Through August 2026 it is running 0.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024151,717
2025153,120
2026 through August109,236
2025, same months109,927
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,583
July 202615,934
June 202615,503
May 202614,446
April 202616,121
March 202614,403
February 20269,962
January 20268,284
December 20257,211
November 202510,347
October 202510,943
September 202514,692
August 202513,132
July 202517,520
June 202516,106
May 202515,212
April 202516,268
March 202514,082
February 20258,065
January 20259,542
December 20248,140
November 20247,801
October 202411,802
September 202410,318
August 202416,438
July 202414,220
June 202416,931
May 202415,718
April 202416,851
March 202413,028
February 202410,814
January 20249,656

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the SR DeSoto II plant?

SR DeSoto II made 0.1% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.2% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 89th largest of 263 plants in Georgia, the 3,432nd largest of 14,327 in the U.S. and the 793rd largest of 7,223 solar plants. By 2025 generation it is the 70th largest of 242 generating plants in the state.

SR DeSoto II within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)6542,7190.2%
Generation (MWh)153,120144,967,3520.1%
Solar capacity (MW)655,4141.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the SR DeSoto II plant, and when do they retire?

1 operable generator totals 65 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s165100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SOTO2OperatingSolar Photovoltaic652023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the SR DeSoto II plant?

EIA lists no joint owners for SR DeSoto II. SR DeSoto II, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the SR DeSoto II plant?

SR DeSoto II is in DeSoto, Lee County, Georgia, at 31.8704° N, 84.0357° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and SR DeSoto II's 65 MW is 1% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
SR Cedar Springs, LLCEarly70164,226
Hobnail SolarBurke70163,394
SR PerryHouston68157,117
SR DeSoto IILee65153,120
SR DeSoto IIILee60135,019
OE_GA3Mitchell58123,829
Hazlehurst IIJeff Davis5362,114

Source: EIA Forms EIA-860 and EIA-923, 2025.