Solar power plant, Georgia

CPV Stagecoach Solar power plant, Georgia

CPV Stagecoach Solar is a 80 MW solar power plant in Macon County, Georgia, operated by CPV Stagecoach Solar, LLC, and it generated 170,060 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Georgia, and its capacity factor sits at the 59th percentile of U.S. solar plants. By 2025 generation it ranks 2,720th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
24%Capacity factor, 2025, 59th percentile, on 80 MW net summer
0.1%Of GA generation, 2025
1 yearAverage generator age, by MW

How hard does the CPV Stagecoach Solar plant run compared with other solar plants?

The CPV Stagecoach Solar plant had a capacity factor of 24% in 2025 on 80 MW of net summer capacity, the 59th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
CPV Stagecoach Solar24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the CPV Stagecoach Solar plant generating more or less than last year?

CPV Stagecoach Solar generated 170,060 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.3% ahead of the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024117,740
2025170,060
2026 through August121,659
2025, same months121,247
Monthly generation, May 2024 to Aug 2026
MonthMWh
August 202616,085
July 202618,268
June 202617,222
May 202615,949
April 202617,782
March 202615,927
February 202610,819
January 20269,607
December 20258,181
November 202512,031
October 202512,610
September 202515,991
August 202514,021
July 202518,259
June 202517,038
May 202516,441
April 202517,130
March 202515,760
February 202511,404
January 202511,194
December 20249,595
November 20249,139
October 202415,210
September 202411,877
August 202420,742
July 202416,081
June 202418,491
May 202416,605

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the CPV Stagecoach Solar plant?

CPV Stagecoach Solar made 0.1% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.2% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 67th largest of 263 plants in Georgia, the 2,965th largest of 14,327 in the U.S. and the 560th largest of 7,223 solar plants. By 2025 generation it is the 65th largest of 242 generating plants in the state.

CPV Stagecoach Solar within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)8042,7190.2%
Generation (MWh)170,060144,967,3520.1%
Solar capacity (MW)805,4141.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the CPV Stagecoach Solar plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SC1OperatingSolar Photovoltaic802024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the CPV Stagecoach Solar plant?

EIA lists no joint owners for CPV Stagecoach Solar. CPV Stagecoach Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the CPV Stagecoach Solar plant?

CPV Stagecoach Solar is in Andersonville, Macon County, Georgia, at 32.1978° N, 84.0693° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and CPV Stagecoach Solar's 80 MW is 1% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
Blackwater SolarWare80188,661
SR AileyMontgomery80191,007
Bulldog Solar LLCWarren80171,305
CPV Stagecoach SolarMacon80170,060
White Oak Solar, LLCBurke77139,790
SR TerrellTerrell74172,578
SR Cedar Springs, LLCEarly70164,226

Source: EIA Forms EIA-860 and EIA-923, 2025.