Solar power plant, Georgia
CPV Stagecoach Solar power plant, Georgia
CPV Stagecoach Solar is a 80 MW solar power plant in Macon County, Georgia, operated by CPV Stagecoach Solar, LLC, and it generated 170,060 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Georgia, and its capacity factor sits at the 59th percentile of U.S. solar plants. By 2025 generation it ranks 2,720th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the CPV Stagecoach Solar plant run compared with other solar plants?
The CPV Stagecoach Solar plant had a capacity factor of 24% in 2025 on 80 MW of net summer capacity, the 59th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| CPV Stagecoach Solar | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the CPV Stagecoach Solar plant generating more or less than last year?
CPV Stagecoach Solar generated 170,060 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.3% ahead of the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 117,740 |
| 2025 | 170,060 |
| 2026 through August | 121,659 |
| 2025, same months | 121,247 |
Monthly generation, May 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 16,085 |
| July 2026 | 18,268 |
| June 2026 | 17,222 |
| May 2026 | 15,949 |
| April 2026 | 17,782 |
| March 2026 | 15,927 |
| February 2026 | 10,819 |
| January 2026 | 9,607 |
| December 2025 | 8,181 |
| November 2025 | 12,031 |
| October 2025 | 12,610 |
| September 2025 | 15,991 |
| August 2025 | 14,021 |
| July 2025 | 18,259 |
| June 2025 | 17,038 |
| May 2025 | 16,441 |
| April 2025 | 17,130 |
| March 2025 | 15,760 |
| February 2025 | 11,404 |
| January 2025 | 11,194 |
| December 2024 | 9,595 |
| November 2024 | 9,139 |
| October 2024 | 15,210 |
| September 2024 | 11,877 |
| August 2024 | 20,742 |
| July 2024 | 16,081 |
| June 2024 | 18,491 |
| May 2024 | 16,605 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the CPV Stagecoach Solar plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SC1 | Operating | Solar Photovoltaic | 80 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the CPV Stagecoach Solar plant?
EIA lists no joint owners for CPV Stagecoach Solar. CPV Stagecoach Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the CPV Stagecoach Solar plant?
CPV Stagecoach Solar is in Andersonville, Macon County, Georgia, at 32.1978° N, 84.0693° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Georgia are similar in size?
Georgia has 152 operable solar plants with 5,414 MW of capacity, and CPV Stagecoach Solar's 80 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Blackwater Solar | Ware | 80 | 188,661 |
| SR Ailey | Montgomery | 80 | 191,007 |
| Bulldog Solar LLC | Warren | 80 | 171,305 |
| CPV Stagecoach Solar | Macon | 80 | 170,060 |
| White Oak Solar, LLC | Burke | 77 | 139,790 |
| SR Terrell | Terrell | 74 | 172,578 |
| SR Cedar Springs, LLC | Early | 70 | 164,226 |
Source: EIA Forms EIA-860 and EIA-923, 2025.