Solar power plant, Michigan
Calhoun County Solar Project, Michigan
Calhoun County Solar Project is a 125 MW solar power plant in Calhoun County, Michigan, operated by AES Clean Energy, and it generated 217,429 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Michigan, and its capacity factor sits at the 25th percentile of U.S. solar plants. By 2025 generation it ranks 2,378th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Calhoun County Solar Project plant run compared with other solar plants?
The Calhoun County Solar Project plant had a capacity factor of 20% in 2025 on 125 MW of net summer capacity, the 25th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 72 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Calhoun County Solar Project | 20% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Calhoun County Solar Project plant generating more or less than last year?
Calhoun County Solar Project generated 217,429 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 21.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 217,429 |
| 2026 through August | 183,626 |
| 2025, same months | 151,564 |
Monthly generation, Mar 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 26,809 |
| July 2026 | 35,666 |
| June 2026 | 34,232 |
| May 2026 | 32,153 |
| April 2026 | 22,098 |
| March 2026 | 14,623 |
| February 2026 | 7,160 |
| January 2026 | 10,885 |
| December 2025 | 8,091 |
| November 2025 | 10,865 |
| October 2025 | 19,315 |
| September 2025 | 27,594 |
| August 2025 | 31,136 |
| July 2025 | 33,155 |
| June 2025 | 32,691 |
| May 2025 | 26,207 |
| April 2025 | 25,244 |
| March 2025 | 3,131 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Calhoun County Solar Project plant, and when do they retire?
1 operable generator totals 125 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 125 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Solar Photovoltaic | 125 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Calhoun County Solar Project plant?
EIA lists no joint owners for Calhoun County Solar Project. AES Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Calhoun County Solar Project plant?
Calhoun County Solar Project is in Sheridan Township, Calhoun County, Michigan, at 42.2540° N, 84.8130° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Michigan are similar in size?
Michigan has 70 operable solar plants with 1,967 MW of capacity, and Calhoun County Solar Project's 125 MW is 6% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Coldwater River Solar | Branch | 150 | 52,238 |
| River Fork Solar, LLC | Calhoun | 149 | 293,367 |
| White Tail Solar | Washtenaw | 140 | 11,708 |
| Calhoun County Solar Project | Calhoun | 125 | 217,429 |
| Assembly Solar II LLC | Shiawassee | 110 | 225,905 |
| Cereal City Solar, LLC | Calhoun | 100 | 196,187 |
| Polaris Solar Park | Gratiot | 100 | 58,951 |
Source: EIA Forms EIA-860 and EIA-923, 2025.