Cereal City Solar, LLC power plant, Michigan

Cereal City Solar, LLC is a 100 MW solar power plant in Calhoun County, Michigan, operated by Cereal City Solar, LLC, and it generated 196,187 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Michigan, and its capacity factor sits at the 44th percentile of U.S. solar plants. By 2025 generation it ranks 2,523rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
22%Capacity factor, 2025, 44th percentile, on 100 MW net summer
0.2%Of MI generation, 2025
2 yearsAverage generator age, by MW

How hard does the Cereal City Solar, LLC plant run compared with other solar plants?

The Cereal City Solar, LLC plant had a capacity factor of 22% in 2025 on 100 MW of net summer capacity, the 44th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cereal City Solar, LLC22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cereal City Solar, LLC plant generating more or less than last year?

Generation at Cereal City Solar, LLC fell 1.4% from 2024 to 2025, from 199,030 MWh to 196,187 MWh. Through August 2026 it is running 1.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024199,030
2025196,187
2026 through August146,034
2025, same months144,379
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202619,033
July 202627,466
June 202625,822
May 202624,993
April 202617,070
March 202614,968
February 202610,539
January 20266,143
December 20255,212
November 20258,290
October 202515,798
September 202522,508
August 202525,509
July 202525,001
June 202522,528
May 202520,929
April 202519,784
March 202514,691
February 20259,004
January 20256,933
December 20244,404
November 20246,584
October 202418,906
September 202421,490
August 202424,978
July 202427,462
June 202425,723
May 202420,485
April 202419,193
March 202415,047
February 202411,940
January 20242,818

Source: EIA Form EIA-923, through August 2026.

How much of Michigan's electricity comes from the Cereal City Solar, LLC plant?

Cereal City Solar, LLC made 0.2% of the 127,929,498 MWh reported by Michigan plants in 2025, from 0.3% of the state's 34,725 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 57th largest of 283 plants in Michigan, the 2,602nd largest of 14,327 in the U.S. and the 478th largest of 7,223 solar plants. By 2025 generation it is the 58th largest of 261 generating plants in the state.

Cereal City Solar, LLC within Michigan, 2025
MeasureThis plantMichiganShare
Capacity (MW)10034,7250.3%
Generation (MWh)196,187127,929,4980.2%
Solar capacity (MW)1001,9675.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cereal City Solar, LLC plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CCSPVOperatingSolar Photovoltaic1002023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cereal City Solar, LLC plant?

EIA lists no joint owners for Cereal City Solar, LLC. Cereal City Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Cereal City Solar, LLC plant?

Cereal City Solar, LLC is in Battle Creek, Calhoun County, Michigan, at 42.3058° N, 85.0323° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Michigan are similar in size?

Michigan has 70 operable solar plants with 1,967 MW of capacity, and Cereal City Solar, LLC's 100 MW is 5% of that.

Solar plants in Michigan around this size
PlantCountyMW2025 MWh
White Tail SolarWashtenaw14011,708
Calhoun County Solar ProjectCalhoun125217,429
Assembly Solar II LLCShiawassee110225,905
Cereal City Solar, LLCCalhoun100196,187
Polaris Solar ParkGratiot10058,951
Pine River Solar ParkGratiot8078,143
Assembly Solar IIIShiawassee79164,992