Solar power plant, Michigan
Assembly Solar II LLC power plant, Michigan
Assembly Solar II LLC is a 110 MW solar power plant in Shiawassee County, Michigan, operated by Assembly Solar II LLC, and it generated 225,905 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Michigan, and its capacity factor sits at the 53rd percentile of U.S. solar plants. By 2025 generation it ranks 2,338th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Assembly Solar II LLC plant run compared with other solar plants?
The Assembly Solar II LLC plant had a capacity factor of 23% in 2025 on 110 MW of net summer capacity, the 53rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 86 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Assembly Solar II LLC | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Assembly Solar II LLC plant generating more or less than last year?
Generation at Assembly Solar II LLC rose 0.7% from 2024 to 2025, from 224,233 MWh to 225,905 MWh. Through August 2026 it is running 1.9% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 224,233 |
| 2025 | 225,905 |
| 2026 through August | 166,916 |
| 2025, same months | 170,197 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 24,613 |
| July 2026 | 31,194 |
| June 2026 | 23,070 |
| May 2026 | 27,323 |
| April 2026 | 20,202 |
| March 2026 | 16,342 |
| February 2026 | 14,939 |
| January 2026 | 9,233 |
| December 2025 | 6,698 |
| November 2025 | 8,145 |
| October 2025 | 16,638 |
| September 2025 | 24,227 |
| August 2025 | 24,673 |
| July 2025 | 28,489 |
| June 2025 | 29,398 |
| May 2025 | 26,364 |
| April 2025 | 21,559 |
| March 2025 | 18,631 |
| February 2025 | 11,891 |
| January 2025 | 9,192 |
| December 2024 | 5,393 |
| November 2024 | 7,294 |
| October 2024 | 19,692 |
| September 2024 | 23,691 |
| August 2024 | 28,182 |
| July 2024 | 30,223 |
| June 2024 | 28,101 |
| May 2024 | 29,625 |
| April 2024 | 17,943 |
| March 2024 | 13,514 |
| February 2024 | 14,965 |
| January 2024 | 5,610 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Assembly Solar II LLC plant, and when do they retire?
1 operable generator totals 110 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 110 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| AS2 | Operating | Solar Photovoltaic | 110 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Assembly Solar II LLC plant?
EIA lists no joint owners for Assembly Solar II LLC. Assembly Solar II LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Assembly Solar II LLC plant?
Assembly Solar II LLC is in Lennon, Shiawassee County, Michigan, at 43.0437° N, 83.9600° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Michigan are similar in size?
Michigan has 70 operable solar plants with 1,967 MW of capacity, and Assembly Solar II LLC's 110 MW is 6% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| River Fork Solar, LLC | Calhoun | 149 | 293,367 |
| White Tail Solar | Washtenaw | 140 | 11,708 |
| Calhoun County Solar Project | Calhoun | 125 | 217,429 |
| Assembly Solar II LLC | Shiawassee | 110 | 225,905 |
| Cereal City Solar, LLC | Calhoun | 100 | 196,187 |
| Polaris Solar Park | Gratiot | 100 | 58,951 |
| Pine River Solar Park | Gratiot | 80 | 78,143 |
Source: EIA Forms EIA-860 and EIA-923, 2025.