Skip to main content
RateWatt

Solar power plant, Michigan

Assembly Solar II LLC power plant, Michigan

Assembly Solar II LLC is a 110 MW solar power plant in Shiawassee County, Michigan, operated by Assembly Solar II LLC, and it generated 225,905 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Michigan, and its capacity factor sits at the 53rd percentile of U.S. solar plants. By 2025 generation it ranks 2,338th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

110 MWNameplate capacity
23%Capacity factor, 2025, 53rd percentile, on 110 MW net summer
0.2%Of MI generation, 2025
4 yearsAverage generator age, by MW

How hard does the Assembly Solar II LLC plant run compared with other solar plants?

The Assembly Solar II LLC plant had a capacity factor of 23% in 2025 on 110 MW of net summer capacity, the 53rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 86 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Assembly Solar II LLC23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Assembly Solar II LLC plant generating more or less than last year?

Generation at Assembly Solar II LLC rose 0.7% from 2024 to 2025, from 224,233 MWh to 225,905 MWh. Through August 2026 it is running 1.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024224,233
2025225,905
2026 through August166,916
2025, same months170,197
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202624,613
July 202631,194
June 202623,070
May 202627,323
April 202620,202
March 202616,342
February 202614,939
January 20269,233
December 20256,698
November 20258,145
October 202516,638
September 202524,227
August 202524,673
July 202528,489
June 202529,398
May 202526,364
April 202521,559
March 202518,631
February 202511,891
January 20259,192
December 20245,393
November 20247,294
October 202419,692
September 202423,691
August 202428,182
July 202430,223
June 202428,101
May 202429,625
April 202417,943
March 202413,514
February 202414,965
January 20245,610

Source: EIA Form EIA-923, through August 2026.

How much of Michigan's electricity comes from the Assembly Solar II LLC plant?

Assembly Solar II LLC made 0.2% of the 127,929,498 MWh reported by Michigan plants in 2025, from 0.3% of the state's 34,725 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 52nd largest of 283 plants in Michigan, the 2,430th largest of 14,327 in the U.S. and the 401st largest of 7,223 solar plants. By 2025 generation it is the 52nd largest of 261 generating plants in the state.

Assembly Solar II LLC within Michigan, 2025
MeasureThis plantMichiganShare
Capacity (MW)11034,7250.3%
Generation (MWh)225,905127,929,4980.2%
Solar capacity (MW)1101,9675.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Assembly Solar II LLC plant, and when do they retire?

1 operable generator totals 110 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1110100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
AS2OperatingSolar Photovoltaic1102021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Assembly Solar II LLC plant?

EIA lists no joint owners for Assembly Solar II LLC. Assembly Solar II LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Assembly Solar II LLC plant?

Assembly Solar II LLC is in Lennon, Shiawassee County, Michigan, at 43.0437° N, 83.9600° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Michigan are similar in size?

Michigan has 70 operable solar plants with 1,967 MW of capacity, and Assembly Solar II LLC's 110 MW is 6% of that.

Solar plants in Michigan around this size
PlantCountyMW2025 MWh
River Fork Solar, LLCCalhoun149293,367
White Tail SolarWashtenaw14011,708
Calhoun County Solar ProjectCalhoun125217,429
Assembly Solar II LLCShiawassee110225,905
Cereal City Solar, LLCCalhoun100196,187
Polaris Solar ParkGratiot10058,951
Pine River Solar ParkGratiot8078,143

Source: EIA Forms EIA-860 and EIA-923, 2025.