Natural gas power plant, Ohio
Carroll County Energy natural gas power plant, Ohio
Carroll County Energy is a 832 MW natural gas power plant in Carroll County, Ohio, operated by Carroll County Energy LLC, and it generated 5,270,057 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.6% of the generation reported in Ohio, and its capacity factor sits at the 96th percentile of U.S. natural gas plants. By 2025 generation it ranks 207th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Carroll County Energy plant run compared with other natural gas plants?
The Carroll County Energy plant had a capacity factor of 84% in 2025 on 715 MW of net summer capacity, the 96th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 307 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Carroll County Energy | 84% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Carroll County Energy plant generating more or less than last year?
Generation at Carroll County Energy fell 1.5% from 2024 to 2025, from 5,351,481 MWh to 5,270,057 MWh. Through August 2026 it is running 8.6% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 5,351,481 |
| 2025 | 5,270,057 |
| 2026 through August | 3,715,484 |
| 2025, same months | 3,420,320 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 507,152 |
| July 2026 | 503,121 |
| June 2026 | 459,202 |
| May 2026 | 464,919 |
| April 2026 | 472,025 |
| March 2026 | 376,032 |
| February 2026 | 458,977 |
| January 2026 | 474,056 |
| December 2025 | 508,234 |
| November 2025 | 479,389 |
| October 2025 | 372,736 |
| September 2025 | 489,378 |
| August 2025 | 488,988 |
| July 2025 | 497,172 |
| June 2025 | 462,941 |
| May 2025 | 478,450 |
| April 2025 | 444,826 |
| March 2025 | 93,707 |
| February 2025 | 455,188 |
| January 2025 | 499,048 |
| December 2024 | 512,861 |
| November 2024 | 496,548 |
| October 2024 | 379,051 |
| September 2024 | 481,361 |
| August 2024 | 495,509 |
| July 2024 | 501,889 |
| June 2024 | 478,118 |
| May 2024 | 507,676 |
| April 2024 | 483,554 |
| March 2024 | 192,418 |
| February 2024 | 316,736 |
| January 2024 | 505,760 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Carroll County Energy plant, and when do they retire?
3 operable generators total 832 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 3 | 832 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CGT1 | Operating | Natural Gas Fired Combined Cycle | 236 | 2017 | n/a |
| CGT2 | Operating | Natural Gas Fired Combined Cycle | 236 | 2017 | n/a |
| SGT1 | Operating | Natural Gas Fired Combined Cycle | 361 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Carroll County Energy plant?
EIA lists no joint owners for Carroll County Energy. Carroll County Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Carroll County Energy plant?
Carroll County Energy is in Carrollton, Carroll County, Ohio, at 40.6044° N, 81.0592° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Ohio are similar in size?
Ohio has 47 operable natural gas plants with 18,398 MW of capacity, and Carroll County Energy's 832 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Rolling Hills Generating | Vinton | 978 | 2,041,916 |
| Middletown- Ohio | Trumbull | 962 | 6,529,886 |
| Waterford Power, LLC | Washington | 922 | 5,173,270 |
| Carroll County Energy | Carroll | 832 | 5,270,057 |
| Troy Energy LLC | Wood | 796 | 1,274,334 |
| Fremont Energy Center | Sandusky | 740 | 4,028,785 |
| Washington Energy Facility | Washington | 715 | 3,508,822 |
Source: EIA Forms EIA-860 and EIA-923, 2025.