Skip to main content
RateWatt

Natural gas power plant, Ohio

Middletown-Ohio natural gas power plant, Ohio

Middletown-Ohio is a 962 MW natural gas power plant in Trumbull County, Ohio, operated by Clean Energy Future-Lordstown, LLC, and it generated 6,529,886 MWh in 2025 (Forms EIA-860 and EIA-923). That is 4.5% of the generation reported in Ohio, and its capacity factor sits at the 97th percentile of U.S. natural gas plants. By 2025 generation it ranks 153rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

962 MWNameplate capacity
87%Capacity factor, 2025, 97th percentile, on 857 MW net summer
4.5%Of OH generation, 2025
7 yearsAverage generator age, by MW

How hard does the Middletown-Ohio plant run compared with other natural gas plants?

The Middletown-Ohio plant had a capacity factor of 87% in 2025 on 857 MW of net summer capacity, the 97th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 318 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Middletown-Ohio87%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Middletown-Ohio plant generating more or less than last year?

Generation at Middletown-Ohio rose 1.2% from 2024 to 2025, from 6,453,066 MWh to 6,529,886 MWh. Through August 2026 it is running 2.4% behind the same months of 2025.

Net generation by period
PeriodMWh
20246,453,066
20256,529,886
2026 through August4,180,643
2025, same months4,281,377
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026599,854
July 2026581,645
June 2026447,669
May 2026525,302
April 2026341,843
March 2026563,126
February 2026503,744
January 2026617,460
December 2025629,227
November 2025497,716
October 2025502,217
September 2025619,349
August 2025591,363
July 2025585,939
June 2025569,671
May 2025593,244
April 2025138,155
March 2025600,056
February 2025580,217
January 2025622,732
December 2024612,191
November 2024529,627
October 2024489,259
September 2024577,646
August 2024605,276
July 2024529,368
June 2024471,932
May 2024547,341
April 2024276,710
March 2024583,722
February 2024599,149
January 2024630,845

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Middletown-Ohio plant?

Middletown-Ohio made 4.5% of the 145,060,499 MWh reported by Ohio plants in 2025, from 2.8% of the state's 34,392 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 11th largest of 215 plants in Ohio, the 323rd largest of 14,327 in the U.S. and the 161st largest of 1,962 natural gas plants. By 2025 generation it is the 9th largest of 187 generating plants in the state.

Middletown-Ohio within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)96234,3922.8%
Generation (MWh)6,529,886145,060,4994.5%
Natural gas capacity (MW)96218,3985.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Middletown-Ohio plant, and when do they retire?

3 operable generators total 962 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s3962100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTG1OperatingNatural Gas Fired Combined Cycle3112018n/a
CTG2OperatingNatural Gas Fired Combined Cycle3112018n/a
STG1OperatingNatural Gas Fired Combined Cycle3402018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Middletown-Ohio plant?

EIA lists no joint owners for Middletown-Ohio. Clean Energy Future-Lordstown, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Middletown-Ohio plant?

Middletown-Ohio is in Lordstown, Trumbull County, Ohio, at 41.1489° N, 80.8516° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Ohio are similar in size?

Ohio has 47 operable natural gas plants with 18,398 MW of capacity, and Middletown-Ohio's 962 MW is 5% of that.

Natural gas plants in Ohio around this size
PlantCountyMW2025 MWh
South Field EnergyColumbiana1,2107,218,175
Oregon Clean Energy CenterLucas1,0605,609,595
Rolling Hills GeneratingVinton9782,041,916
Middletown- OhioTrumbull9626,529,886
Waterford Power, LLCWashington9225,173,270
Carroll County EnergyCarroll8325,270,057
Troy Energy LLCWood7961,274,334

Source: EIA Forms EIA-860 and EIA-923, 2025.