Castle Gap Solar Hybrid power plant, Texas
Castle Gap Solar Hybrid is a 190 MW power plant, 180 MW of it solar, in Upton County, Texas, operated by Upton County Solar 2 LLC, and it generated 384,210 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 60th percentile of U.S. solar plants. By 2025 generation it ranks 1,639th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Castle Gap Solar Hybrid plant run compared with other solar plants?
The Castle Gap Solar Hybrid plant's solar units had a capacity factor of 24% in 2025 on 180 MW of net summer capacity, the 60th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Castle Gap Solar Hybrid | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Castle Gap Solar Hybrid plant generating more or less than last year?
Generation at Castle Gap Solar Hybrid fell 3.0% from 2024 to 2025, from 396,135 MWh to 384,210 MWh. Through August 2026 it is running 11.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 396,135 |
| 2025 | 384,210 |
| 2026 through August | 243,064 |
| 2025, same months | 275,225 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 41,079 |
| July 2026 | 38,309 |
| June 2026 | 28,216 |
| May 2026 | 32,422 |
| April 2026 | 30,231 |
| March 2026 | 27,492 |
| February 2026 | 23,965 |
| January 2026 | 21,350 |
| December 2025 | 22,691 |
| November 2025 | 24,739 |
| October 2025 | 29,145 |
| September 2025 | 32,410 |
| August 2025 | 38,151 |
| July 2025 | 39,190 |
| June 2025 | 37,249 |
| May 2025 | 39,526 |
| April 2025 | 32,520 |
| March 2025 | 31,482 |
| February 2025 | 29,960 |
| January 2025 | 27,147 |
| December 2024 | 24,519 |
| November 2024 | 24,169 |
| October 2024 | 32,923 |
| September 2024 | 35,909 |
| August 2024 | 46,083 |
| July 2024 | 41,991 |
| June 2024 | 39,473 |
| May 2024 | 39,514 |
| April 2024 | 33,505 |
| March 2024 | 25,744 |
| February 2024 | 26,989 |
| January 2024 | 25,316 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Castle Gap Solar Hybrid plant, and when do they retire?
2 operable generators total 190 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 2 | 190 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CGAP | Operating | Solar Photovoltaic | 180 | 2018 | n/a |
| BAT1 | Operating | Batteries | 10 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Castle Gap Solar Hybrid plant?
EIA lists no joint owners for Castle Gap Solar Hybrid. Upton County Solar 2 LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Castle Gap Solar Hybrid plant use?
Castle Gap Solar Hybrid has capacity on 2 fuels: 95% solar and 5% battery and pumped storage. In 2025, solar made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 180 | 94.8% | 384,511 |
| Battery and pumped storage | 10 | 5.2% | -301 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Castle Gap Solar Hybrid plant?
Castle Gap Solar Hybrid is in McCarney, Upton County, Texas, at 31.2550° N, 102.2720° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Castle Gap Solar Hybrid's 180 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Angelo Solar | Tom Green | 195 | 513,838 |
| Aragorn Solar Project | Culberson | 187 | 357,974 |
| Midway Solar - TX | Pecos | 182 | 332,466 |
| Castle Gap Solar Hybrid | Upton | 180 | 384,511 |
| Oriana Solar LLC | Victoria | 180 | 122,472 |
| Azalea Springs Solar Park | Angelina | 180 | 239,942 |
| Swift Air Solar II | Ector | 174 | 33,850 |
Source: EIA Forms EIA-860 and EIA-923, 2025.