Castle Gap Solar Hybrid is a 190 MW power plant, 180 MW of it solar, in Upton County, Texas, operated by Upton County Solar 2 LLC, and it generated 384,210 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 60th percentile of U.S. solar plants. By 2025 generation it ranks 1,639th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

190 MWNameplate capacity
24%Capacity factor, 2025, solar units, 60th percentile, on 180 MW net summer
0.1%Of TX generation, 2025
7 yearsAverage generator age, by MW

How hard does the Castle Gap Solar Hybrid plant run compared with other solar plants?

The Castle Gap Solar Hybrid plant's solar units had a capacity factor of 24% in 2025 on 180 MW of net summer capacity, the 60th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Castle Gap Solar Hybrid24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Castle Gap Solar Hybrid plant generating more or less than last year?

Generation at Castle Gap Solar Hybrid fell 3.0% from 2024 to 2025, from 396,135 MWh to 384,210 MWh. Through August 2026 it is running 11.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024396,135
2025384,210
2026 through August243,064
2025, same months275,225
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202641,079
July 202638,309
June 202628,216
May 202632,422
April 202630,231
March 202627,492
February 202623,965
January 202621,350
December 202522,691
November 202524,739
October 202529,145
September 202532,410
August 202538,151
July 202539,190
June 202537,249
May 202539,526
April 202532,520
March 202531,482
February 202529,960
January 202527,147
December 202424,519
November 202424,169
October 202432,923
September 202435,909
August 202446,083
July 202441,991
June 202439,473
May 202439,514
April 202433,505
March 202425,744
February 202426,989
January 202425,316

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Castle Gap Solar Hybrid plant?

Castle Gap Solar Hybrid made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 347th largest of 1,023 plants in Texas, the 1,701st largest of 14,327 in the U.S. and the 211th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 336th largest of 816 generating plants in the state.

Castle Gap Solar Hybrid within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)190195,9660.1%
Generation (MWh)384,210592,896,1760.1%
Solar capacity (MW)18030,7390.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Castle Gap Solar Hybrid plant, and when do they retire?

2 operable generators total 190 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s2190100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CGAPOperatingSolar Photovoltaic1802018n/a
BAT1OperatingBatteries102019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Castle Gap Solar Hybrid plant?

EIA lists no joint owners for Castle Gap Solar Hybrid. Upton County Solar 2 LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Castle Gap Solar Hybrid plant use?

Castle Gap Solar Hybrid has capacity on 2 fuels: 95% solar and 5% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar18094.8%384,511
Battery and pumped storage105.2%-301

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Castle Gap Solar Hybrid plant?

Castle Gap Solar Hybrid is in McCarney, Upton County, Texas, at 31.2550° N, 102.2720° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Castle Gap Solar Hybrid's 180 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Angelo SolarTom Green195513,838
Aragorn Solar ProjectCulberson187357,974
Midway Solar - TXPecos182332,466
Castle Gap Solar HybridUpton180384,511
Oriana Solar LLCVictoria180122,472
Azalea Springs Solar ParkAngelina180239,942
Swift Air Solar IIEctor17433,850