Solar power plant, Texas
Oriana Solar LLC power plant, Texas
Oriana Solar LLC is a 180 MW solar power plant in Victoria County, Texas, operated by Oriana Solar LLC, and it generated 122,472 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 6th percentile of U.S. solar plants. By 2025 generation it ranks 3,176th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Oriana Solar LLC plant run compared with other solar plants?
The Oriana Solar LLC plant had a capacity factor of 8% in 2025 on 180 MW of net summer capacity, the 6th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 28 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Oriana Solar LLC | 8% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Oriana Solar LLC plant generating more or less than last year?
Oriana Solar LLC generated 122,472 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 122,472 |
| 2026 through August | 279,986 |
Monthly generation, Sep 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 43,751 |
| July 2026 | 42,998 |
| June 2026 | 37,535 |
| May 2026 | 37,824 |
| April 2026 | 27,423 |
| March 2026 | 37,466 |
| February 2026 | 28,914 |
| January 2026 | 24,075 |
| December 2025 | 21,416 |
| November 2025 | 27,930 |
| October 2025 | 34,916 |
| September 2025 | 38,210 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Oriana Solar LLC plant, and when do they retire?
1 operable generator totals 180 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 180 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ORIPV | Operating | Solar Photovoltaic | 180 | 2025 | n/a |
| ORIBS | Cancelled | Batteries | 61 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Oriana Solar LLC plant?
EIA lists no joint owners for Oriana Solar LLC. Oriana Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Oriana Solar LLC plant?
Oriana Solar LLC is in Victoria, Victoria County, Texas, at 28.9053° N, 96.9781° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Oriana Solar LLC's 180 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Aragorn Solar Project | Culberson | 187 | 357,974 |
| Midway Solar - TX | Pecos | 182 | 332,466 |
| Castle Gap Solar Hybrid | Upton | 180 | 384,511 |
| Oriana Solar LLC | Victoria | 180 | 122,472 |
| Azalea Springs Solar Park | Angelina | 180 | 239,942 |
| Swift Air Solar II | Ector | 174 | 33,850 |
| Concho Valley Solar, LLC | Tom Green | 173 | 303,594 |
Source: EIA Forms EIA-860 and EIA-923, 2025.