Solar power plant, Texas
Aragorn Solar Project, Texas
Aragorn Solar Project is a 187 MW solar power plant in Culberson County, Texas, operated by SE Aragorn, LLC, and it generated 357,974 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 47th percentile of U.S. solar plants. By 2025 generation it ranks 1,741st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Aragorn Solar Project plant run compared with other solar plants?
The Aragorn Solar Project plant had a capacity factor of 23% in 2025 on 180 MW of net summer capacity, the 47th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Aragorn Solar Project | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Aragorn Solar Project plant generating more or less than last year?
Generation at Aragorn Solar Project rose 4.0% from 2024 to 2025, from 344,347 MWh to 357,974 MWh. Through August 2026 it is running 3.5% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 344,347 |
| 2025 | 357,974 |
| 2026 through August | 239,375 |
| 2025, same months | 248,089 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 50,877 |
| July 2026 | 48,097 |
| June 2026 | 27,496 |
| May 2026 | 36,235 |
| April 2026 | 24,492 |
| March 2026 | 17,398 |
| February 2026 | 16,499 |
| January 2026 | 18,281 |
| December 2025 | 21,163 |
| November 2025 | 26,776 |
| October 2025 | 30,446 |
| September 2025 | 31,500 |
| August 2025 | 34,318 |
| July 2025 | 36,511 |
| June 2025 | 30,184 |
| May 2025 | 43,103 |
| April 2025 | 31,405 |
| March 2025 | 25,300 |
| February 2025 | 26,612 |
| January 2025 | 20,656 |
| December 2024 | 20,314 |
| November 2024 | 23,603 |
| October 2024 | 30,438 |
| September 2024 | 33,071 |
| August 2024 | 33,928 |
| July 2024 | 31,114 |
| June 2024 | 36,783 |
| May 2024 | 40,485 |
| April 2024 | 25,016 |
| March 2024 | 28,551 |
| February 2024 | 19,714 |
| January 2024 | 21,330 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Aragorn Solar Project plant, and when do they retire?
1 operable generator totals 187 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 187 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| IPAGN | Operating | Solar Photovoltaic | 187 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Aragorn Solar Project plant?
EIA lists no joint owners for Aragorn Solar Project. SE Aragorn, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Aragorn Solar Project plant?
Aragorn Solar Project is in Van Horn, Culberson County, Texas, at 31.7200° N, 104.4423° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Aragorn Solar Project's 187 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Impact Solar 1 | Lamar | 199 | 361,267 |
| Tres Bahias | Calhoun | 196 | 438,740 |
| Angelo Solar | Tom Green | 195 | 513,838 |
| Aragorn Solar Project | Culberson | 187 | 357,974 |
| Midway Solar - TX | Pecos | 182 | 332,466 |
| Castle Gap Solar Hybrid | Upton | 180 | 384,511 |
| Oriana Solar LLC | Victoria | 180 | 122,472 |
Source: EIA Forms EIA-860 and EIA-923, 2025.