Solar power plant, Texas
Tres Bahias solar power plant, Texas
Tres Bahias is a 196 MW solar power plant in Calhoun County, Texas, operated by Tres Bahias Solar Power, LLC, and it generated 438,740 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 68th percentile of U.S. solar plants. By 2025 generation it ranks 1,490th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Tres Bahias plant run compared with other solar plants?
The Tres Bahias plant had a capacity factor of 26% in 2025 on 196 MW of net summer capacity, the 68th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Tres Bahias | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Tres Bahias plant generating more or less than last year?
Generation at Tres Bahias rose 6.6% from 2024 to 2025, from 411,426 MWh to 438,740 MWh. Through August 2026 it is running 1.6% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 411,426 |
| 2025 | 438,740 |
| 2026 through August | 304,144 |
| 2025, same months | 299,303 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 51,935 |
| July 2026 | 50,073 |
| June 2026 | 40,634 |
| May 2026 | 40,006 |
| April 2026 | 32,134 |
| March 2026 | 42,918 |
| February 2026 | 26,500 |
| January 2026 | 19,944 |
| December 2025 | 22,643 |
| November 2025 | 29,957 |
| October 2025 | 39,576 |
| September 2025 | 47,261 |
| August 2025 | 48,398 |
| July 2025 | 48,732 |
| June 2025 | 48,791 |
| May 2025 | 42,507 |
| April 2025 | 37,710 |
| March 2025 | 34,556 |
| February 2025 | 22,003 |
| January 2025 | 16,606 |
| December 2024 | 22,328 |
| November 2024 | 28,481 |
| October 2024 | 41,279 |
| September 2024 | 34,781 |
| August 2024 | 44,764 |
| July 2024 | 36,107 |
| June 2024 | 49,020 |
| May 2024 | 36,712 |
| April 2024 | 35,407 |
| March 2024 | 33,701 |
| February 2024 | 28,753 |
| January 2024 | 20,093 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Tres Bahias plant, and when do they retire?
1 operable generator totals 196 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 196 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TB | Operating | Solar Photovoltaic | 196 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Tres Bahias plant?
EIA lists no joint owners for Tres Bahias. Tres Bahias Solar Power, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Tres Bahias plant?
Tres Bahias is in Port Lavaca, Calhoun County, Texas, at 28.6885° N, 96.5098° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Tres Bahias' 196 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Big Elm Solar | Bell | 200 | 481,352 |
| Stoneridge Solar, LLC | Milam | 200 | 256,476 |
| Impact Solar 1 | Lamar | 199 | 361,267 |
| Tres Bahias | Calhoun | 196 | 438,740 |
| Angelo Solar | Tom Green | 195 | 513,838 |
| Aragorn Solar Project | Culberson | 187 | 357,974 |
| Midway Solar - TX | Pecos | 182 | 332,466 |
Source: EIA Forms EIA-860 and EIA-923, 2025.