Solar power plant, Texas
Impact Solar 1 power plant, Texas
Impact Solar 1 is a 199 MW solar power plant in Lamar County, Texas, operated by Lightsource Renewable Energy Asset Management, LLC, and it generated 361,267 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 31st percentile of U.S. solar plants. By 2025 generation it ranks 1,731st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Impact Solar 1 plant run compared with other solar plants?
The Impact Solar 1 plant had a capacity factor of 21% in 2025 on 199 MW of net summer capacity, the 31st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 76 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Impact Solar 1 | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Impact Solar 1 plant generating more or less than last year?
Generation at Impact Solar 1 rose 6.3% from 2024 to 2025, from 339,723 MWh to 361,267 MWh. Through August 2026 it is running 10.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 339,723 |
| 2025 | 361,267 |
| 2026 through August | 272,496 |
| 2025, same months | 245,625 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 48,301 |
| July 2026 | 51,489 |
| June 2026 | 39,631 |
| May 2026 | 39,466 |
| April 2026 | 26,144 |
| March 2026 | 29,275 |
| February 2026 | 16,584 |
| January 2026 | 21,606 |
| December 2025 | 18,502 |
| November 2025 | 22,409 |
| October 2025 | 34,149 |
| September 2025 | 40,582 |
| August 2025 | 42,660 |
| July 2025 | 49,207 |
| June 2025 | 44,365 |
| May 2025 | 36,148 |
| April 2025 | 23,908 |
| March 2025 | 16,217 |
| February 2025 | 16,314 |
| January 2025 | 16,806 |
| December 2024 | 13,146 |
| November 2024 | 19,980 |
| October 2024 | 29,620 |
| September 2024 | 25,089 |
| August 2024 | 38,715 |
| July 2024 | 39,003 |
| June 2024 | 38,777 |
| May 2024 | 32,349 |
| April 2024 | 28,392 |
| March 2024 | 31,469 |
| February 2024 | 22,477 |
| January 2024 | 20,706 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Impact Solar 1 plant, and when do they retire?
1 operable generator totals 199 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 199 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TXIM1 | Operating | Solar Photovoltaic | 199 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Impact Solar 1 plant?
Impact Solar 1, LLC is the only joint owner reported for Impact Solar 1, with 100.0%. Lightsource Renewable Energy Asset Management, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Impact Solar 1 plant?
Impact Solar 1 is in Deport, Lamar County, Texas, at 33.4678° N, 95.3709° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Impact Solar 1's 199 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Orion I Solar Project | Milam | 200 | 446,110 |
| Big Elm Solar | Bell | 200 | 481,352 |
| Stoneridge Solar, LLC | Milam | 200 | 256,476 |
| Impact Solar 1 | Lamar | 199 | 361,267 |
| Tres Bahias | Calhoun | 196 | 438,740 |
| Angelo Solar | Tom Green | 195 | 513,838 |
| Aragorn Solar Project | Culberson | 187 | 357,974 |
Source: EIA Forms EIA-860 and EIA-923, 2025.