Orion I Solar Project is a 200 MW solar power plant in Milam County, Texas, operated by Ben Milam Solar 1 LLC, and it generated 446,110 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 68th percentile of U.S. solar plants. By 2025 generation it ranks 1,465th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
25%Capacity factor, 2025, 68th percentile, on 200 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Orion I Solar Project plant run compared with other solar plants?

The Orion I Solar Project plant had a capacity factor of 25% in 2025 on 200 MW of net summer capacity, the 68th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Orion I Solar Project25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Orion I Solar Project plant generating more or less than last year?

Orion I Solar Project generated 446,110 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.3% behind the same months of 2025. 2024 has output for only 5 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024193,405
2025446,110
2026 through August314,242
2025, same months315,093
Monthly generation, Aug 2024 to Aug 2026
MonthMWh
August 202652,156
July 202652,250
June 202644,114
May 202641,439
April 202629,215
March 202641,442
February 202627,608
January 202626,018
December 202520,935
November 202528,418
October 202538,963
September 202542,701
August 202547,735
July 202544,283
June 202548,710
May 202544,314
April 202539,341
March 202540,683
February 202525,236
January 202524,791
December 202423,479
November 202429,733
October 202441,706
September 202443,853
August 202454,634

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Orion I Solar Project plant?

Orion I Solar Project made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 302nd largest of 1,023 plants in Texas, the 1,524th largest of 14,327 in the U.S. and the 173rd largest of 7,223 solar plants. By 2025 generation it is the 301st largest of 816 generating plants in the state.

Orion I Solar Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)446,110592,896,1760.1%
Solar capacity (MW)20030,7390.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Orion I Solar Project plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ORN1OperatingSolar Photovoltaic2002024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Orion I Solar Project plant?

EIA lists no joint owners for Orion I Solar Project. Ben Milam Solar 1 LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Orion I Solar Project plant?

Orion I Solar Project is in Burlington, Milam County, Texas, at 30.9965° N, 97.0015° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Orion I Solar Project's 200 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Shakes SolarDimmit200387,227
Texas Solar Nova 2Kent200562,730
Brazoria County Solar Project (Danciger)Brazoria200422,904
Orion I Solar ProjectMilam200446,110
Big Elm SolarBell200481,352
Stoneridge Solar, LLCMilam200256,476
Impact Solar 1Lamar199361,267

Source: EIA Forms EIA-860 and EIA-923, 2025.