Solar power plant, Texas

Brazoria County Solar Project (Danciger) power plant, Texas

Brazoria County Solar Project (Danciger) is a 200 MW solar power plant in Brazoria County, Texas, operated by Brazoria County Solar Project, LLC, and it generated 422,904 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 58th percentile of U.S. solar plants. By 2025 generation it ranks 1,522nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
24%Capacity factor, 2025, 58th percentile, on 200 MW net summer
0.1%Of TX generation, 2025
3 yearsAverage generator age, by MW

How hard does the Brazoria County Solar Project (Danciger) plant run compared with other solar plants?

The Brazoria County Solar Project (Danciger) plant had a capacity factor of 24% in 2025 on 200 MW of net summer capacity, the 58th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 88 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Brazoria County Solar Project (Danciger)24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Brazoria County Solar Project (Danciger) plant generating more or less than last year?

Generation at Brazoria County Solar Project (Danciger) rose 9.2% from 2024 to 2025, from 387,412 MWh to 422,904 MWh. Through August 2026 it is running 11.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024387,412
2025422,904
2026 through August260,802
2025, same months294,090
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202641,062
July 202638,473
June 202633,009
May 202635,605
April 202619,634
March 202638,506
February 202629,344
January 202625,169
December 202521,396
November 202530,053
October 202533,986
September 202543,379
August 202543,156
July 202545,349
June 202545,684
May 202545,168
April 202536,912
March 202535,429
February 202522,782
January 202519,610
December 202422,278
November 202425,606
October 202438,201
September 202432,955
August 202447,666
July 202436,957
June 202449,549
May 202434,830
April 202429,542
March 202427,363
February 202420,773
January 202421,692

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Brazoria County Solar Project (Danciger) plant?

Brazoria County Solar Project (Danciger) made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 302nd largest of 1,023 plants in Texas, the 1,524th largest of 14,327 in the U.S. and the 168th largest of 7,223 solar plants. By 2025 generation it is the 314th largest of 816 generating plants in the state.

Brazoria County Solar Project (Danciger) within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)422,904592,896,1760.1%
Solar capacity (MW)20030,7390.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Brazoria County Solar Project (Danciger) plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BRZ01OperatingSolar Photovoltaic2002022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Brazoria County Solar Project (Danciger) plant?

EIA lists no joint owners for Brazoria County Solar Project (Danciger). Brazoria County Solar Project, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Brazoria County Solar Project (Danciger) plant?

Brazoria County Solar Project (Danciger) is in Damon, Brazoria County, Texas, at 29.1779° N, 95.7612° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Brazoria County Solar Project (Danciger)'s 200 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Horizon SolarFrio200463,949
Shakes SolarDimmit200387,227
Texas Solar Nova 2Kent200562,730
Brazoria County Solar Project (Danciger)Brazoria200422,904
Orion I Solar ProjectMilam200446,110
Big Elm SolarBell200481,352
Stoneridge Solar, LLCMilam200256,476

Source: EIA Forms EIA-860 and EIA-923, 2025.