Horizon Solar is a 200 MW solar power plant in Frio County, Texas, operated by Leeward Asset Management, LLC, and it generated 463,949 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 74th percentile of U.S. solar plants. By 2025 generation it ranks 1,423rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Horizon Solar plant run compared with other solar plants?
The Horizon Solar plant had a capacity factor of 26% in 2025 on 200 MW of net summer capacity, the 74th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Horizon Solar | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Horizon Solar plant generating more or less than last year?
Generation at Horizon Solar rose 7.8% from 2024 to 2025, from 430,446 MWh to 463,949 MWh. Through August 2026 it is running 2.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 430,446 |
| 2025 | 463,949 |
| 2026 through August | 315,561 |
| 2025, same months | 324,293 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 51,937 |
| July 2026 | 45,324 |
| June 2026 | 45,235 |
| May 2026 | 43,844 |
| April 2026 | 27,000 |
| March 2026 | 42,230 |
| February 2026 | 32,029 |
| January 2026 | 27,962 |
| December 2025 | 23,405 |
| November 2025 | 29,660 |
| October 2025 | 42,695 |
| September 2025 | 43,896 |
| August 2025 | 53,247 |
| July 2025 | 44,594 |
| June 2025 | 47,163 |
| May 2025 | 46,800 |
| April 2025 | 40,943 |
| March 2025 | 44,234 |
| February 2025 | 25,059 |
| January 2025 | 22,253 |
| December 2024 | 22,527 |
| November 2024 | 29,621 |
| October 2024 | 39,091 |
| September 2024 | 43,675 |
| August 2024 | 54,044 |
| July 2024 | 44,505 |
| June 2024 | 42,522 |
| May 2024 | 28,199 |
| April 2024 | 32,794 |
| March 2024 | 35,670 |
| February 2024 | 32,643 |
| January 2024 | 25,155 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Horizon Solar plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HRZNS | Operating | Solar Photovoltaic | 200 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Horizon Solar plant?
EIA lists no joint owners for Horizon Solar. Leeward Asset Management, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Horizon Solar plant?
Horizon Solar is in Pearsall, Frio County, Texas, at 28.9377° N, 99.1077° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Horizon Solar's 200 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Big Star Solar, LLC (Hybrid) | Bastrop | 200 | 376,255 |
| Brazoria West | Brazoria | 200 | 422,616 |
| Corazon Energy LLC | Webb | 200 | 369,146 |
| Horizon Solar | Frio | 200 | 463,949 |
| Shakes Solar | Dimmit | 200 | 387,227 |
| Texas Solar Nova 2 | Kent | 200 | 562,730 |
| Brazoria County Solar Project (Danciger) | Brazoria | 200 | 422,904 |
Source: EIA Forms EIA-860 and EIA-923, 2025.