Corazon Energy LLC solar power plant, Texas

Corazon Energy LLC is a 200 MW solar power plant in Webb County, Texas, operated by Corazon Energy LLC, and it generated 369,146 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 33rd percentile of U.S. solar plants. By 2025 generation it ranks 1,693rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
21%Capacity factor, 2025, 33rd percentile, on 200 MW net summer
0.1%Of TX generation, 2025
4 yearsAverage generator age, by MW

How hard does the Corazon Energy LLC plant run compared with other solar plants?

The Corazon Energy LLC plant had a capacity factor of 21% in 2025 on 200 MW of net summer capacity, the 33rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Corazon Energy LLC21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Corazon Energy LLC plant generating more or less than last year?

Corazon Energy LLC generated 369,146 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.4% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024295,444
2025369,146
2026 through August258,397
2025, same months245,046
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202644,185
July 202640,661
June 202630,365
May 202639,794
April 202621,804
March 202629,677
February 202627,559
January 202624,352
December 202521,285
November 202525,617
October 202538,298
September 202538,900
August 202547,276
July 202529,372
June 202536,744
May 202521,622
April 202528,535
March 202540,512
February 202523,242
January 202517,743
December 202423,244
November 202430,431
October 202440,591
September 202440,464
August 202430,909
July 20241,654
June 20240
May 202430,669
April 202422,724
March 202429,593
February 202421,189
January 202423,976

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Corazon Energy LLC plant?

Corazon Energy LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 302nd largest of 1,023 plants in Texas, the 1,524th largest of 14,327 in the U.S. and the 154th largest of 7,223 solar plants. By 2025 generation it is the 343rd largest of 816 generating plants in the state.

Corazon Energy LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)369,146592,896,1760.1%
Solar capacity (MW)20030,7390.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Corazon Energy LLC plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
KOV4AOperatingSolar Photovoltaic2002021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Corazon Energy LLC plant?

EIA lists no joint owners for Corazon Energy LLC. Corazon Energy LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Corazon Energy LLC plant?

Corazon Energy LLC is in Rachito Las Lomas, Webb County, Texas, at 27.6347° N, 99.2583° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Corazon Energy LLC's 200 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
ANSON Solar Center, LLCJones200503,715
Big Star Solar, LLC (Hybrid)Bastrop200376,255
Brazoria WestBrazoria200422,616
Corazon Energy LLCWebb200369,146
Horizon SolarFrio200463,949
Shakes SolarDimmit200387,227
Texas Solar Nova 2Kent200562,730

Source: EIA Forms EIA-860 and EIA-923, 2025.