Texas Solar Nova 2 is a 200 MW solar power plant in Kent County, Texas, operated by Texas Solar Nova 2, LLC, and it generated 562,730 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 1,206th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Texas Solar Nova 2 plant run compared with other solar plants?
The Texas Solar Nova 2 plant had a capacity factor of 24% in 2025 on 262 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Texas Solar Nova 2 | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Texas Solar Nova 2 plant generating more or less than last year?
Texas Solar Nova 2 generated 562,730 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 2.9% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 487,676 |
| 2025 | 562,730 |
| 2026 through August | 412,045 |
| 2025, same months | 400,481 |
Monthly generation, Feb 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 63,115 |
| July 2026 | 60,702 |
| June 2026 | 56,660 |
| May 2026 | 54,250 |
| April 2026 | 48,535 |
| March 2026 | 52,192 |
| February 2026 | 41,628 |
| January 2026 | 34,963 |
| December 2025 | 33,721 |
| November 2025 | 36,759 |
| October 2025 | 42,055 |
| September 2025 | 49,714 |
| August 2025 | 58,800 |
| July 2025 | 56,455 |
| June 2025 | 56,018 |
| May 2025 | 56,556 |
| April 2025 | 46,677 |
| March 2025 | 51,435 |
| February 2025 | 37,352 |
| January 2025 | 37,188 |
| December 2024 | 31,230 |
| November 2024 | 33,288 |
| October 2024 | 47,255 |
| September 2024 | 46,955 |
| August 2024 | 57,418 |
| July 2024 | 60,426 |
| June 2024 | 58,108 |
| May 2024 | 54,369 |
| April 2024 | 50,826 |
| March 2024 | 44,146 |
| February 2024 | 3,655 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Texas Solar Nova 2 plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TSN2 | Operating | Solar Photovoltaic | 200 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Texas Solar Nova 2 plant?
EIA lists no joint owners for Texas Solar Nova 2. Texas Solar Nova 2, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Texas Solar Nova 2 plant?
Texas Solar Nova 2 is in Spur, Kent County, Texas, at 33.3206° N, 100.9817° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Texas Solar Nova 2's 200 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Corazon Energy LLC | Webb | 200 | 369,146 |
| Horizon Solar | Frio | 200 | 463,949 |
| Shakes Solar | Dimmit | 200 | 387,227 |
| Texas Solar Nova 2 | Kent | 200 | 562,730 |
| Brazoria County Solar Project (Danciger) | Brazoria | 200 | 422,904 |
| Orion I Solar Project | Milam | 200 | 446,110 |
| Big Elm Solar | Bell | 200 | 481,352 |
Source: EIA Forms EIA-860 and EIA-923, 2025.