Solar power plant, Texas
Stoneridge Solar, LLC power plant, Texas
Stoneridge Solar, LLC is a 200 MW solar power plant in Milam County, Texas, operated by RWE Clean Energy, and it generated 256,476 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 12th percentile of U.S. solar plants. By 2025 generation it ranks 2,179th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Stoneridge Solar, LLC plant run compared with other solar plants?
The Stoneridge Solar, LLC plant had a capacity factor of 15% in 2025 on 200 MW of net summer capacity, the 12th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 53 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Stoneridge Solar, LLC | 15% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Stoneridge Solar, LLC plant generating more or less than last year?
Stoneridge Solar, LLC generated 256,476 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 112.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 256,476 |
| 2026 through August | 312,196 |
| 2025, same months | 146,745 |
Monthly generation, Apr 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 52,832 |
| July 2026 | 51,462 |
| June 2026 | 44,603 |
| May 2026 | 41,965 |
| April 2026 | 28,933 |
| March 2026 | 41,196 |
| February 2026 | 28,874 |
| January 2026 | 22,331 |
| December 2025 | 21,233 |
| November 2025 | 19,713 |
| October 2025 | 26,950 |
| September 2025 | 41,835 |
| August 2025 | 42,806 |
| July 2025 | 36,042 |
| June 2025 | 33,221 |
| May 2025 | 32,445 |
| April 2025 | 2,231 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Stoneridge Solar, LLC plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 100 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SSPV | Operating | Solar Photovoltaic | 200 | 2025 | n/a |
| SSBA | Built, not yet operating | Batteries | 100 | 2026 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Stoneridge Solar, LLC plant?
EIA lists no joint owners for Stoneridge Solar, LLC. RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Stoneridge Solar, LLC plant?
Stoneridge Solar, LLC is in Thorndale, Milam County, Texas, at 30.5694° N, 97.1104° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Stoneridge Solar, LLC's 200 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Brazoria County Solar Project (Danciger) | Brazoria | 200 | 422,904 |
| Orion I Solar Project | Milam | 200 | 446,110 |
| Big Elm Solar | Bell | 200 | 481,352 |
| Stoneridge Solar, LLC | Milam | 200 | 256,476 |
| Impact Solar 1 | Lamar | 199 | 361,267 |
| Tres Bahias | Calhoun | 196 | 438,740 |
| Angelo Solar | Tom Green | 195 | 513,838 |
Source: EIA Forms EIA-860 and EIA-923, 2025.