Solar power plant, Virginia
Cavalier Solar A2 power plant, Virginia
Cavalier Solar A2 is a 84.4 MW solar power plant in Isle of Wight County, Virginia, operated by AES Clean Energy, and it generated 158,795 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 37th percentile of U.S. solar plants. By 2025 generation it ranks 2,816th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Cavalier Solar A2 plant run compared with other solar plants?
The Cavalier Solar A2 plant had a capacity factor of 21% in 2025 on 84.4 MW of net summer capacity, the 37th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cavalier Solar A2 | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Cavalier Solar A2 plant generating more or less than last year?
Cavalier Solar A2 generated 158,795 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.3% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 7,601 |
| 2025 | 158,795 |
| 2026 through August | 116,928 |
| 2025, same months | 115,430 |
Monthly generation, Dec 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,741 |
| July 2026 | 15,763 |
| June 2026 | 19,147 |
| May 2026 | 18,379 |
| April 2026 | 17,749 |
| March 2026 | 14,794 |
| February 2026 | 9,143 |
| January 2026 | 8,212 |
| December 2025 | 8,682 |
| November 2025 | 10,312 |
| October 2025 | 12,416 |
| September 2025 | 11,955 |
| August 2025 | 14,882 |
| July 2025 | 17,611 |
| June 2025 | 18,463 |
| May 2025 | 13,167 |
| April 2025 | 17,076 |
| March 2025 | 15,010 |
| February 2025 | 9,552 |
| January 2025 | 9,669 |
| December 2024 | 7,601 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Cavalier Solar A2 plant, and when do they retire?
1 operable generator totals 84.4 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 84 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CAVA2 | Operating | Solar Photovoltaic | 84 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Cavalier Solar A2 plant?
EIA lists no joint owners for Cavalier Solar A2. AES Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Cavalier Solar A2 plant?
Cavalier Solar A2 is in Smithfield, Isle of Wight County, Virginia, at 37.0180° N, 76.7358° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Virginia are similar in size?
Virginia has 141 operable solar plants with 5,163 MW of capacity, and Cavalier Solar A2's 84.4 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sadler Solar | Greensville | 100 | 183,888 |
| Spring Grove I | Surry | 98 | 184,300 |
| Desper Solar | Louisa | 88 | 125,489 |
| Cavalier Solar A2 | Isle of Wight | 84 | 158,795 |
| Foxhound | Halifax | 83 | 155,873 |
| Eastern Shore Solar, LLC | Accomack | 80 | 157,913 |
| Piney Creek Solar | Halifax | 80 | 153,471 |
Source: EIA Forms EIA-860 and EIA-923, 2025.