Desper Solar is a 88.2 MW solar power plant in Louisa County, Virginia, operated by Dominion Renewable Energy, and it generated 125,489 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 14th percentile of U.S. solar plants. By 2025 generation it ranks 3,141st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

88.2 MWNameplate capacity
16%Capacity factor, 2025, 14th percentile, on 88.2 MW net summer
0.1%Of VA generation, 2025
4 yearsAverage generator age, by MW

How hard does the Desper Solar plant run compared with other solar plants?

The Desper Solar plant had a capacity factor of 16% in 2025 on 88.2 MW of net summer capacity, the 14th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 59 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Desper Solar16%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Desper Solar plant generating more or less than last year?

Generation at Desper Solar rose 6.0% from 2024 to 2025, from 118,440 MWh to 125,489 MWh. Through August 2026 it is running 39.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024118,440
2025125,489
2026 through August124,801
2025, same months89,448
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202618,474
July 202618,489
June 202620,721
May 202619,511
April 202617,464
March 202613,469
February 20269,484
January 20267,189
December 20256,043
November 20257,354
October 202511,053
September 202511,591
August 202513,274
July 202517,127
June 202511,057
May 202510,585
April 202511,366
March 202511,815
February 20256,541
January 20257,683
December 20245,247
November 20246,415
October 202410,738
September 202410,610
August 202413,571
July 202412,185
June 202415,562
May 202411,979
April 202411,912
March 202410,499
February 20246,141
January 20243,581

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Desper Solar plant?

Desper Solar made 0.1% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.3% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 49th largest of 259 plants in Virginia, the 2,874th largest of 14,327 in the U.S. and the 513th largest of 7,223 solar plants. By 2025 generation it is the 66th largest of 241 generating plants in the state.

Desper Solar within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)8831,3120.3%
Generation (MWh)125,489106,220,8590.1%
Solar capacity (MW)885,1631.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Desper Solar plant, and when do they retire?

1 operable generator totals 88.2 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s188100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic882021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Desper Solar plant?

EIA lists no joint owners for Desper Solar. Dominion Renewable Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Desper Solar plant?

Desper Solar is in Louisa, Louisa County, Virginia, at 38.0157° N, 78.0431° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Desper Solar's 88.2 MW is 2% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Southampton Solar, LLCSouthampton100174,208
Sadler SolarGreensville100183,888
Spring Grove ISurry98184,300
Desper SolarLouisa88125,489
Cavalier Solar A2Isle of Wight84158,795
FoxhoundHalifax83155,873
Eastern Shore Solar, LLCAccomack80157,913

Source: EIA Forms EIA-860 and EIA-923, 2025.