Solar power plant, Virginia
Sadler Solar power plant, Virginia
Sadler Solar is a 100 MW solar power plant in Greensville County, Virginia, operated by Dominion Energy Inc., and it generated 183,888 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Virginia, and its capacity factor sits at the 32nd percentile of U.S. solar plants. By 2025 generation it ranks 2,610th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sadler Solar plant run compared with other solar plants?
The Sadler Solar plant had a capacity factor of 21% in 2025 on 100 MW of net summer capacity, the 32nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sadler Solar | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sadler Solar plant generating more or less than last year?
Generation at Sadler Solar rose 4.0% from 2024 to 2025, from 176,829 MWh to 183,888 MWh. Through August 2026 it is running 2.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 176,829 |
| 2025 | 183,888 |
| 2026 through August | 138,479 |
| 2025, same months | 135,666 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 19,911 |
| July 2026 | 20,074 |
| June 2026 | 23,188 |
| May 2026 | 19,426 |
| April 2026 | 19,774 |
| March 2026 | 16,615 |
| February 2026 | 10,297 |
| January 2026 | 9,194 |
| December 2025 | 8,132 |
| November 2025 | 10,846 |
| October 2025 | 15,243 |
| September 2025 | 14,001 |
| August 2025 | 18,145 |
| July 2025 | 23,544 |
| June 2025 | 22,474 |
| May 2025 | 17,502 |
| April 2025 | 20,198 |
| March 2025 | 12,281 |
| February 2025 | 9,927 |
| January 2025 | 11,595 |
| December 2024 | 9,054 |
| November 2024 | 10,171 |
| October 2024 | 15,128 |
| September 2024 | 13,839 |
| August 2024 | 19,340 |
| July 2024 | 18,588 |
| June 2024 | 21,960 |
| May 2024 | 15,960 |
| April 2024 | 16,271 |
| March 2024 | 14,299 |
| February 2024 | 12,990 |
| January 2024 | 9,229 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sadler Solar plant, and when do they retire?
1 operable generator totals 100 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 100 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SADL | Operating | Solar Photovoltaic | 100 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sadler Solar plant?
EIA lists no joint owners for Sadler Solar. Dominion Energy Inc. operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sadler Solar plant?
Sadler Solar is in Emporia, Greensville County, Virginia, at 36.6867° N, 77.5580° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Virginia are similar in size?
Virginia has 141 operable solar plants with 5,163 MW of capacity, and Sadler Solar's 100 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Maplewood Solar | Pittsylvania | 120 | 188,457 |
| Waverly Solar, LLC | Sussex | 118 | 205,737 |
| Southampton Solar, LLC | Southampton | 100 | 174,208 |
| Sadler Solar | Greensville | 100 | 183,888 |
| Spring Grove I | Surry | 98 | 184,300 |
| Desper Solar | Louisa | 88 | 125,489 |
| Cavalier Solar A2 | Isle of Wight | 84 | 158,795 |
Source: EIA Forms EIA-860 and EIA-923, 2025.