Cedar Ridge wind power plant, Wisconsin

Cedar Ridge is a 67.7 MW wind power plant in Fond Du Lac County, Wisconsin, operated by Wisconsin Power & Light Co, and it generated 184,837 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Wisconsin, and its capacity factor sits at the 44th percentile of U.S. wind plants. By 2025 generation it ranks 2,601st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

67.7 MWNameplate capacity
31%Capacity factor, 2025, 44th percentile, on 67.7 MW net summer
0.3%Of WI generation, 2025
17 yearsAverage generator age, by MW

How hard does the Cedar Ridge plant run compared with other wind plants?

The Cedar Ridge plant had a capacity factor of 31% in 2025 on 67.7 MW of net summer capacity, the 44th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 114 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cedar Ridge31%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cedar Ridge plant generating more or less than last year?

Generation at Cedar Ridge rose 5.9% from 2024 to 2025, from 174,585 MWh to 184,837 MWh.

Net generation by period
PeriodMWh
2024174,585
2025184,837
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202519,890
November 202518,098
October 202512,451
September 20257,006
August 20256,077
July 20256,955
June 202510,503
May 202511,219
April 202516,173
March 202519,897
February 202515,771
January 202540,797
December 202417,180
November 202417,415
October 202420,026
September 20249,445
August 20247,357
July 20244,612
June 202412,929
May 202412,907
April 202420,424
March 202421,128
February 202416,388
January 202414,774

Source: EIA Form EIA-923, through August 2026.

How much of Wisconsin's electricity comes from the Cedar Ridge plant?

Cedar Ridge made 0.3% of the 66,249,756 MWh reported by Wisconsin plants in 2025, from 0.3% of the state's 19,442 MW of capacity. By capacity it is the 49th largest of 273 plants in Wisconsin, the 3,398th largest of 14,327 in the U.S. and the 804th largest of 1,358 wind plants. By 2025 generation it is the 37th largest of 259 generating plants in the state.

Cedar Ridge within Wisconsin, 2025
MeasureThis plantWisconsinShare
Capacity (MW)6819,4420.3%
Generation (MWh)184,83766,249,7560.3%
Wind capacity (MW)688238.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cedar Ridge plant, and when do they retire?

1 operable generator totals 67.7 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s168100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine682008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cedar Ridge plant?

EIA lists no joint owners for Cedar Ridge. Wisconsin Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Wisconsin Power & Light Co charge homes?

Wisconsin Power & Light Co, the operator of Cedar Ridge, had an average residential price of 18.47¢ per kWh and an average bill of $128 a month in 2025, 2% above the Wisconsin average of 18.08¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Wisconsin
Wisconsin Power & Light Co18.47¢$1282% higher
Wisconsin average18.08¢$121
U.S. average17.23¢$1515% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Cedar Ridge plant?

Cedar Ridge is in Eden, Fond Du Lac County, Wisconsin, at 43.6926° N, 88.3297° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Wisconsin are similar in size?

Wisconsin has 12 operable wind plants with 823 MW of capacity, and Cedar Ridge's 67.7 MW is 8% of that.

Wind plants in Wisconsin around this size
PlantCountyMW2025 MWh
Forward Wind Energy CenterDodge129134,640
Quilt Block Wind Farm LLCLafayette98381,137
Red Barn EnergyGrant92253,697
Cedar RidgeFond Du Lac68184,837
Butler RidgeDodge54141,755

Source: EIA Forms EIA-860 and EIA-923, 2025.