Wind power plant, Arizona
Chevelon Butte Phase 2 wind power plant, Arizona
Chevelon Butte Phase 2 is a 216 MW wind power plant in Coconino County, Arizona, operated by AES Clean Energy, and it generated 525,472 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Arizona, and its capacity factor sits at the 32nd percentile of U.S. wind plants. By 2025 generation it ranks 1,295th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Chevelon Butte Phase 2 plant run compared with other wind plants?
The Chevelon Butte Phase 2 plant had a capacity factor of 28% in 2025 on 216 MW of net summer capacity, the 32nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 101 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Chevelon Butte Phase 2 | 28% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Chevelon Butte Phase 2 plant generating more or less than last year?
Chevelon Butte Phase 2 generated 525,472 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 12.0% behind the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 297,481 |
| 2025 | 525,472 |
| 2026 through August | 354,781 |
| 2025, same months | 403,083 |
Monthly generation, Apr 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 34,448 |
| July 2026 | 36,527 |
| June 2026 | 69,419 |
| May 2026 | 59,217 |
| April 2026 | 59,468 |
| March 2026 | 41,997 |
| February 2026 | 30,616 |
| January 2026 | 23,089 |
| December 2025 | 28,815 |
| November 2025 | 21,900 |
| October 2025 | 34,779 |
| September 2025 | 36,895 |
| August 2025 | 44,496 |
| July 2025 | 52,528 |
| June 2025 | 50,749 |
| May 2025 | 51,446 |
| April 2025 | 48,742 |
| March 2025 | 62,548 |
| February 2025 | 52,062 |
| January 2025 | 40,512 |
| December 2024 | 26,482 |
| November 2024 | 39,404 |
| October 2024 | 29,949 |
| September 2024 | 32,127 |
| August 2024 | 30,331 |
| July 2024 | 32,134 |
| June 2024 | 49,836 |
| May 2024 | 57,218 |
| April 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Chevelon Butte Phase 2 plant, and when do they retire?
1 operable generator totals 216 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 216 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CHVB2 | Operating | Onshore Wind Turbine | 216 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Chevelon Butte Phase 2 plant?
EIA lists no joint owners for Chevelon Butte Phase 2. AES Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Chevelon Butte Phase 2 plant?
Chevelon Butte Phase 2 is in Winslow, Coconino County, Arizona, at 34.6821° N, 110.8030° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Arizona are similar in size?
Arizona has 8 operable wind plants with 1,205 MW of capacity, and Chevelon Butte Phase 2's 216 MW is 18% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Mohave County Wind Farm | Mohave | 350 | 997,150 |
| Chevelon Butte Wind Farm | Coconino | 238 | 624,169 |
| Chevelon Butte Phase 2 | Coconino | 216 | 525,472 |
| Babbitt Ranch Energy Center | Coconino | 163 | 552,206 |
Source: EIA Forms EIA-860 and EIA-923, 2025.